Laserfiche WebLink
6.C. - Page 26 of 57 <br />I-01111M <br />ILIBIRF <br />ENGINEERS I SURVEYORS f PMNERS <br />255 Shoreline Drive, Suite 200 <br />Redwood City, CA 94065 <br />6501482-3600, Fax 6501482-6399 <br />As part of the 1.03 Wilson (Jefferson & Franklin) project, the developer will construct <br />improvements within the public right-of-way on Franklin Street. Certain improvements will be <br />eligible for funding under the City's Transportation Impact Fee (TIF) program. The <br />improvements which are eligible for this funding are described below. <br />Bulb -outs at Intersection of Franklin and Wilson Streets <br />Bulb -outs will be installed on the sidewalk at each of the four corners of the Franklin <br />and Wilson Intersection. New ADA -compliant curb ramps will be installed at each of <br />these bulb -outs. The intersection will be re -graded and paved to accommodate the <br />bulb -outs. In addition, a new curb inlet will be installed at the West corner of the <br />intersection and connected to the existing Storm Drain in Franklin Street at a new <br />manhole. This curb inlet is required to create positive drainage at the bulb -out at a <br />slope acceptable to the City. <br />Franklin Street Sidewalk Replacement at AT&T Fronta e <br />The sidewalk along the Southwest side of Franklin Street will be widened between <br />Jefferson Avenue and Wilson Street. This widening will require removal and <br />replacement of sidewalk, curb, and gutter, street lights, and street trees. Existing <br />utility structures in the sidewalk and street in the area of the reconstructed sidewalk <br />will need to be adjusted to final grade. The existing traffic signal at the South corner <br />of the intersection of Franklin Street and Jefferson Avenue will be relocated to <br />facilitate construction of an ADA -curb ramp. An existing gas line is located in Franklin <br />Street. Widening of the sidewalk will place the gas line within the sidewalk and <br />potentially in the location of proposed street trees, street lights, and curb inlets. A <br />relocation of this gas line may be required to facilitate the sidewalk widening. <br />ATTY/AGR12015.1071GREYSTAR - 103 WILSON - IA WITH TIF CREDIT <br />REV: 05-28-15 VR <br />page J&Je21 of 27 <br />52 <br />