My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-06-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-06-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:50:59 AM
Creation date
6/4/2020 8:06:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
827
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 36 of 82 <br />Section VI. Additional Responsibilities <br />1. Facilities Services Responsibilities <br />Attachment 2 <br />a. For routine maintenance of systems, Facilities Services will <br />I. Provide the Contractor with advance schedule to the extent practicable <br />11. Provide Contractor no less than 24 hours' notice when that <br />maintenance is to occur (allowing Contractor to weigh in as to whether <br />or not the scheduled maintenance will interfere with operation and if it <br />will Interfere Contractor will give alternate dates within a reasonable <br />time frame when the repairfservice can be completed.) <br />III. Provide Contractor with acknowledgement that the service has in fact <br />occurred and any unusual findings related to that service. This <br />notification will be done by a service request confirmation. <br />b. For other than routine scheduled maintenance <br />I. Contractor will notify Facilities Services of needed repair/service <br />without delay via phone, fax, or email to the DPW call center. <br />Contractor shall be responsible for any damage to the Shelter, its <br />contents or any person caused by its failure to timely notify the County <br />of needed emergency repairs of conditions that threaten the structure <br />or its contents or the health or safety of occupants or the public. <br />B. Facilities Services will notify Contractor within 24 hours of its <br />anticipated investigation of requested repair (if the matter is something <br />that can be addressed at the time of investigation, Facilities Services <br />to adhere to steps which follow): <br />a) Notify the Contractor's Maintenance Coordinator at least 24 <br />hours in advance of any scheduled maintenance activity that <br />may affect the Contractor's normal working operation (noise, <br />dust, odors, interruption of water or electrical service, etc.). <br />b) Facilities Services to notify contractor of findings of the <br />investigation and its plan to address (and except for the case of <br />emergency repairs, allowing Contractor to weigh in if the <br />scheduled repairs will interfere with its operation) <br />c) Critical or emergent work will be completed at time of <br />investigation. <br />d) Facilities Services to notify Contractor promptly upon <br />completion of the repair. Notification will be given by service <br />request confirmation of close out. <br />e) Contractor will notify Facilities Services of its review of <br />the repair once completed. <br />f) All communication between Contractor and Facilities Services <br />will be copied to PHPP. <br />g) Facilities Services will leave the work areas safe and clean of <br />IC <br />REV: 06-02-2020 MI <br />361 <br />ATTY/AGR.Amend NQJ/County of San Mateo and SW Cotops (Page 33 of 7Q) <br />
The URL can be used to link to this page
Your browser does not support the video tag.