My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-06-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-06-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:50:59 AM
Creation date
6/4/2020 8:06:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
827
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1. - Page 49 of 82 <br />Attachment 3 <br />page 2 of 34 <br />DISCUSSION: <br />The Public Works Department conducted an extensive review of mandated animal <br />sheltering services, local utilization and similar Bay Area projects. Ultimately, the Public <br />Works Department determined that the cost of constructing a new shelter would be <br />between $15.1 million and $20.2 million. The Public Works Department also considered <br />alternatives to constructing a new shelter <br />such as retrofitting County -owned buildings or using pre -fabricated building technologies. <br />All of the alternatives were determined to be more expensive than building a new shelter <br />from a life -cycle cost perspective. <br />A new shelter, similar to the current shelter, would house animals from all cities and <br />unincorporated areas in the County. All participating entities would save money by sharing <br />in this service agreement. The County would serve as the lead agency in managing the <br />construction of the new building, and would be the sole owner of the completed building. All <br />participating entities, including the County, would share the cost by repaying the County <br />through a 30 -year, interest-free lease agreement. As of May 6, <br />2014, all participating entities have approved the cost participation Memorandum of <br />Agreement (Attachment A). <br />The terms of the Memorandum of Agreement dictate that the lease amount paid by each <br />participating entity will be calculated each year using a combination of a 3 -year average for <br />shelter usage (weighted at 80%) and population (weighted at 20%) <br />(Attachment B). The basis for this allocation is to attribute a larger cost share to level of <br />shelter services used by each participating entity, and a smaller portion to potential use <br />captured by population. <br />Construction is expected to begin in the fall of 2014 and be completed within 18 months. <br />The current building would remain open during construction. The County also will be the <br />lead agency in evaluating potential environmental impacts; each city will have an <br />opportunity to comment at the time the County determines what environmental review <br />process is appropriate. <br />The lease payments would commence once the new building receives its certificate of <br />occupancy, projected to be in late 2015. <br />Approval of this Memorandum of Agreement contributes to the Shared Vision 2025 <br />outcome of a Healthy Community by providing a facility to quarantine and shelter animals. <br />It is anticipated that the completed facility will shelter 17,500 animals during FY 2015-16. <br />PERFORMANCE MEASURE(S): <br />Measure <br />FY 2013-14 Actual <br />FY 2015-16 Projected <br />Number of animals sheltered. <br />17,409 <br />17,500 <br />REV: 06-02-2020 MI <br />ATTY/AGR.Amend No.1/County of San Mateo and SMC Cities (Page 46 of 79) <br />374 <br />
The URL can be used to link to this page
Your browser does not support the video tag.