My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-06-08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-06-08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:50:59 AM
Creation date
6/4/2020 8:06:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
827
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.'. <br />Page 79 of 82 <br />COUNTYOFSAN MATEO <br />COUNTY MANAGER'S OFFICE <br />July 10, 2018 <br />City Manager Carlos Martinez <br />City of East Palo Alto <br />2415 University Avenue <br />East Palo Alto, CA 94303 <br />Attachment 3 <br />page 32 of 34 <br />John L. Mafthie <br />County Manager/ <br />Clerk of the Board <br />County Government Center <br />400 County Center, Ist Floor <br />Redwood City, CA 94063 <br />650-363-4121 T <br />650-363-1916 F <br />www.smcgouorg <br />Re: Notice of Revised Estimated Construction Costs for the Animal Care Shelter Facility <br />Dear City Manager Carlos Martinez, <br />On or about September 9, 2014, the cities and towns within San Mateo County entered into an <br />agreement to share the construction costs of anew animal care shelter facility. The agreement <br />provides that the County of San Mateo will advance the funds for construction to be repaid by <br />the municipalities according to their share, through a 30 -year, interest-free lease agreement. <br />The agreement further provides that project costs were initially estimated to be $20,200,000 <br />and that if the County received information indicating that the construction costs for the animal <br />care shelter facility will exceed the initial estimate by 10 percent or more, the County would <br />provide notice to each City of the revised estimated construction costs. <br />The original bridging documents used as the basis of design in 2014 estimated the animal <br />shelter would be 30,000 SF of interior space. To meet the needs of the animals, the new animal <br />shelter increased the interior space and exterior kennel space to approximately 42,000 SF. In <br />addition to the added square footage, additional enhancements were added. An upgraded <br />heating ventilation air conditioning (HVAC) unit ($600K) and a photovoltaic system ($1.21VI) <br />were added to meet a required air exchange for the animals and to meet the County's Green <br />Policy, both of which the County will not seek reimbursement from the cities. <br />The County has received a revised estimated project cost for the animal care shelter facility in <br />the amount of $26,600,000. The new anticipated annual lease costs of $826,843 are the result <br />of cost escalation in the construction market and design and mechanical enhancements <br />necessary to ensure proper and humane animal care. The last column on Attachment B <br />addresses the new estimated annual lease amount for each city/town. <br />REV: 06-02-2020 MI <br />ATTY/AGR.Amend No.1/County of San Mateo and SMC Cities (Page 76 of 79) <br />i lj <br />
The URL can be used to link to this page
Your browser does not support the video tag.