My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-06-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-06-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:41:37 AM
Creation date
6/18/2020 5:21:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
624
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.J. - Page 22 of 103 <br />ATTACHMENT A <br />91 Finish Paint Body Accessories Above Body Floor White <br />Standard, Components mounted below frame rail shall be coated black., i.e. step <br />92 bumpers, steps, frame <br />extension. pintle hook mount, dock bu nper mounts, D -rings. receiver tubes, <br />accessory mounts, light brackets, <br />under -ride protection, etc. <br />Components mounted to underside of body shall be coated black, i.e. Wheel chock <br />holders. mud flap brackets, pad carriers, boxes, lighting brackets. steps, and ladders. <br />93 Apply Non -Skid Coating to all walking surfaces <br />94 English Safety And Instructional Decals <br />95 Vehicle Height Placard - Installed In Cab <br />96 Green fleet Decals, Hybrid Decal Kit <br />Item <br />Description <br />010 <br />97 Dielectric test unit according to ANSI requirements. 1 <br />98 Stability test unit according to ANSI requirements. 1 <br />99 Focus Factory Build 1 <br />100 Delivery Of Completed Unit 1 <br />101 Inbound Freight 1 <br />102 40G FA Installation 1 <br />103 JEMS 4134 Hybrid System Installation l <br />Hybrid QtV <br />104 JEMS 4134 (Jobsite Energy Management System) Includes ePTO as Primary l <br />Hydraulic Power <br />A. Lithium lon energy storage provides power the Jobsite Energy Management <br />System <br />B. The JEMS Idle Mitigation System automatically eliminates unnecessary engine <br />idle time, manages cabin temperature heating & cooling, and maintains battery state <br />of charge when the vehicle is in park or neutral. <br />C. Integrated Cabin Comfort HVAC provides heating and cooling through the <br />factory vents. <br />D. On -Demand Operation: The ePTO (electric motor and hydraulic pump) is <br />automatically powered when a demand is created either through activation of the <br />Lipper or lower control interlock or by engaging the hydraulic tool circuit. <br />E. Integral safety interlocks ensure the JEMS system operates only when the <br />Transmission is in Park/Neutral, the Parking brake is set, and the engine <br />compartment hood is closed. <br />105 Intentional left blank <br />285 <br />
The URL can be used to link to this page
Your browser does not support the video tag.