My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-07-13 Special Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-07-13 Special Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 9:22:25 AM
Creation date
7/9/2020 6:38:40 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Date
7/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.B. - Page 71 of 177 <br />EXHIBIT D <br />Narrative of Financing Plan <br />I. Construction Financing: <br />Total construction period development costs are estimated at $98,144,495 and will be <br />funded as follows: <br />The project has a construction loan commitment from Citibank, N.A. in the amount of <br />$53,247,500 (plus a $12,689,500 taxable construction trance, for a total of $65,937,000) with <br />a 36 -month term at a variable interest rate. Citibank is providing this construction loan <br />through their 4% LIHTC Construction/Permanent Loan Program. This conventional loan <br />will be used during construction to fund a portion of the construction costs for the above <br />referenced amount. <br />2. The Developer will defer a developer fee totaling $8,459,128 <br />3. The project has a committed equity investor -limited partner, AEGON, that will make equity <br />contributions of $10,164,088 during construction. <br />4. The Developer will defer reserve funding totaling $1,039,383. <br />5. The project has a loan commitment from the County of San Mateo in the amount of <br />$7,057,896, to be paid from residual receipts with a 55 -year term at a fixed interest rate of <br />3%. <br />6. The project has a loan commitment from HEART in the amount of $3,500,000, with a 5 -year <br />term at a fixed interest rate of 3%. <br />7. The Developer will provide seller carryback financing in the amount of $1,987,000, with a <br />55 -year term at a fixed interest rate of 7%. <br />8. The project has met all of its readiness to precede requirements. <br />1199\0912727850.8 <br />353 Main Street Family Apartments <br />Redwood City, California <br />ATTY/AGR.2020.100/353 Main Street Apartments LP (Page 66 of 143) 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.