My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Redwood City Improvement Association-CBID Operating Agreement
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 Redwood City Improvement Association-CBID Operating Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 4:02:59 PM
Creation date
8/12/2020 12:38:10 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Redwood City Improvement Association
PROJECT NAME
Management and Disbursement Agreement
RMP File Number
304
Date
7/28/2020
Reso Ref
Ordinance 2411
MO Ref
See Ord 2411
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
plan proposes that there will be two distinct Benefit Zones for the Downtown CBID. With that <br />in mind, the Benefit Zones, in general, would include the following parcels: <br />Benefit Zone 1 would include: <br />a. All parcels fronting along Broadway from Maple Street on the East to EI Camino on the <br />west, also the site of the new Crossings 900 office building <br />b. Courthouse Square <br />C. Parcels fronting on Theatre Way <br />d. All parcels fronting on the single block of Main Street from Broadway to Middlefield <br />(Upper Main) <br />Benefit Zone 2 would include: <br />a. All commercial/retail, residential and private parcels not included in Benefit Zones 1 <br />Method of Financing: (Please see Section 4 and the Assessment Engineer's report for further <br />detail of the method of financing) <br />The financing of the CBID is based upon the levy of special assessments upon real property that <br />receive special benefits from the improvements and activities. See Section 4 for assessment <br />methodology and compliance with Proposition 218. There will be five factors used in the <br />determination of proportional benefit to the parcels in the CBID. Those five factors are: <br />• Linear frontage along a public street. Parcels will be charged the same frontage rates <br />due to the same frequency of services that the all parcels will receive from the Sidewalk <br />Operations portion of the CBID budget; <br />• Lot square footage or the footprint of the parcel; <br />• Building square footage (excluding parking structures built within the building that <br />predominantly serve the tenants of the building and are not open to the public); and <br />• Residential condos that front along the public rights of way within the District. <br />• Benefit Zones <br />Costs: <br />Annual assessments are based upon an allocation of program costs by assessable linear <br />frontage; PLUS lot or parcel square footage; PLUS assessable building square footage, and in <br />the case of residential condos, only by actual building square footage of the residential condo. <br />The differentiation between residential condo parcels and commercial or non-commercial <br />parcels is detailed in Section 4 of this report. <br />The residential condo owners are assessed differently since they are, in essence, acquiring air <br />rights with the condos and linear frontage and lot size is not relevant to their parcels. This <br />alternate assessment methodology is created to respond to their special needs of homeowners <br />within this potentially ascending sector within the Downtown Redwood City district. All four <br />property variables, including an individual parcel's location within the designated areas for <br />Benefit Zone will be used in the calculation of the annual assessment. The FY 2015 year <br />annual assessments per property variable and Benefit Zone are as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.