My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2020-075315 Improvement Agreement_910 Woodside (Valera Fooksman)_7.31.2020
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Improvement Agreement
>
RecDoc 2020-075315 Improvement Agreement_910 Woodside (Valera Fooksman)_7.31.2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2020 12:35:28 PM
Creation date
8/18/2020 12:05:05 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Subdivision Improvement Agreement 910 Woodside Rd
Doc Num
2020-075315
Rec Date
7/31/2020
Address
910 Woodside Rd
Parties
Valera Fooksman
MO Ref
20-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reasonable discretion, with authority to act for and on behalf of Developer, will be named <br />in writing by Developer prior to commencement of the Work, will be present on the <br />Property during the performance of the Work, and may not be changed without advance <br />notification to and the concurrence of the City Engineer. <br />9. Examination of Work. All of the Work will be consistent with the <br />Improvement Plans and performed to the satisfaction of the City Engineer, in their <br />reasonable discretion. City and its authorized agents will, at all times during the <br />performance of the Work, have free access to the Property and the Work and will be <br />allowed to examine the Work and all materials used and to be used in the Work. <br />10. City Costs; Deposit. Developer will pay to City the actual cost for all <br />engineering, inspection, administration, plan check, laboratory and field-testing, <br />construction, and other services furnished by City in connection with this Agreement, <br />including those performed by consultants under contract with City ("City Costs"). <br />Developer will deposit with City the sum of fifty thousand dollars ($50,000.00) ("Deposit") <br />to compensate City for all City Costs. Developer understands that the Deposit is an <br />estimate and further agrees to pay to City the actual cost of providing such services, in <br />accordance with City's current fees. Developer will complete payment of such additional <br />sum or sums for the services provided by City, if any, within ten (10) days after billing by <br />City of the additional sum to be paid, and the amount payable will be increased by ten <br />percent (10%) in the event payment is not made within such ten (10) day period. Any part <br />of the Deposit or such additional sum or sums not utilized by City will be returned promptly <br />to Developer. <br />11. Completion of Work. After Developer (a) completes the Work in accordance <br />with the Improvement Plans and the terms and conditions of this Agreement, (b) repairs <br />any private or public property damaged as a result of the Work or pays the full cost of <br />such repair to the owner whose property was damaged and (c) obtains the written <br />acceptance of such repair or payment from any owner whose private property was <br />repaired by Developer or to whom Developer paid the full cost of such repair, Developer <br />will provide City with a written notice of completion, together with copies of all written <br />acceptances. <br />12. Final Acceptance. <br />12.1 Notice of Completion. Within thirty (30) days of receipt of Developer's <br />written notification pursuant to Section 11 above, the City Engineer will inspect the <br />Work and repairs and review the written acceptances, if any, and send Developer <br />a written notice stating whether the Work and repairs are complete to the <br />satisfaction of the City Engineer, in their reasonable discretion, and whether the <br />written acceptances have been provided. If the Work and repairs are, in the <br />opinion of the City Engineer, not complete and satisfactory, and/or written <br />acceptances have not been provided, the City Engineer will list the deficiencies <br />that Developer must correct to make the Work and repairs complete and <br />satisfactory. Upon satisfactory completion of the Work and repairs and submittal <br />of written acceptances, the City Engineer will send Developer a written notice of <br />REV: 01-24-20 PR <br />ATTY/AGR.2020.014/Valera Fooksman (Page 4 of 22) <br />
The URL can be used to link to this page
Your browser does not support the video tag.