My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2020-075316 STMMA_910 Woodside (Valera Fooksman)_7.31.2020
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2020-075316 STMMA_910 Woodside (Valera Fooksman)_7.31.2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2020 12:34:01 PM
Creation date
8/18/2020 12:05:32 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA 910 Woodside Rd
Doc Num
2020-075316
Rec Date
7/31/2020
Address
910 Woodside Rd
Parties
Valera Fooksman
MO Ref
20-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br />Pervious Paving & Green Roof System Maintenance Plan for <br />919 Woodside Road, Redwood City, CA <br />PERVIOUS PAVING <br />October 34, 2019 <br />Project Address and Cross Streets 910 Woodside Road(Near Union Ave. & Kentheld Ave.) <br />Assessor's Parcel No.: 059-072-430 & 440 <br />Property Owner_ Valera Fooksman Phone No.: <br />Designated Contact: Phone No.: <br />Mailing Address°_-- <br />The term "pervious paving" encompasses a range of paved stormwater treatment <br />practices, including pervious concrete or porous asphalt, as well as paving atones with <br />permeable joints (°permeable joint pavers'), paving stones or pavers that are permeable <br />themselves, and turf blocks, These different types of pervious paving facilities all <br />accomplish a similar function by allowing infiltration of stormwater. <br />The property contains 9 area of pervious paving, located as described below and as <br />shown in the attached site pian'. <br />• Pervious Paving Facility No. i is a located along the rear and two side property lines. <br />1. Routine Maintenance Activities <br />Routine maintenance activities for pervious paving facilities, and the frequency at which <br />they will be conducted, are shown in Table 1- Note that there is some variation in <br />maintenance requirements depending on the type of pavement. For example, vacuum <br />sweeping is generally required for pervious pavement, but is prohibited for permeable joint <br />pavers that use sand in the joints between pavers. <br />In addition to, or in support of, any routine maintenance activities identified here, pervious <br />paving products should be maintained in accordance with any manufacturer's instructions. <br />Mare applicable, manufacturer's instructionslmaintenance guidelines for pervious paving <br />products should be included as an attachment to this plan. <br />Table 1 <br />Routine Mainisnance Activities for Pervious Paving <br />Frequency arTask <br />No. Maintenance Task <br />1 Ctieck for sediment and debris accumulation. Prevent <br />soil from wasting or blowing onto the pavement. Do not <br />store sand, soil, mulch or other landscaping materlals <br />on pervious pavement surfaces.. <br />2 1Conduct preventative surface cleaning, using <br />oommefcially available regenerative air or vacuum <br />sweepers, to remove sediment and debris. <br />Inspect for any signs of pavement failure. Repair any <br />surface deformations or broken pavers- Repla" <br />missing joint filler in PICP. <br />Two to four times annually <br />Two to four tlmas annually <br />Two to tour times annually <br />' Attached site pian must match the site plan exhibit to Maintenance Agreement, <br />Page 1 <br />REV: 01-23-20 PR <br />ATTY/AGR.2020;012Nalera Fooksman (Page 13 of 16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.