My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2020-075316 STMMA_910 Woodside (Valera Fooksman)_7.31.2020
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2020-075316 STMMA_910 Woodside (Valera Fooksman)_7.31.2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2020 12:34:01 PM
Creation date
8/18/2020 12:05:32 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA 910 Woodside Rd
Doc Num
2020-075316
Rec Date
7/31/2020
Address
910 Woodside Rd
Parties
Valera Fooksman
MO Ref
20-015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "C" <br />Pervious Paving & Green Roof System Maintenance Plan for <br />910 Woodside Road, Redwood city, CA <br />October 30, 2019 <br />Project Address and Cross Streets 910 Woodside Road (Near Union Ave. & Kentheld Ave.) <br />Assessor's Parcel No.: 059-072-430 &440 <br />Property Owner Valera Fooksman Phone <br />Designated Contact <br />Mailing Address'„_,_, <br />The tern "pervious paving" encompasses a range of paved stormwater treatment <br />practices, including pervious concrete or porous asphalt, as well as paving stones with <br />permeable joints ("permeable joint pavers"), paving stones or pavers that are permeable <br />themselves, and turf blocks. These different types of pervious paving facilities all <br />accomplish a similar function by allowing infiltration of stormwater. <br />The property contains 1 area of pervious paving, located as described below and as <br />shown in the attached site plan'. <br />. Pervious Paving Facility No. t is a located along the rear and two side property lines. <br />1. Routine Maintenance Activities <br />Routine maintenance activities for pervious paving facilities, and the frequency at which <br />they will be conducted, are shown in Table 1. Note that there is some variation in <br />maintenance requirements depending on the type of pavement. For example, vacuum <br />sweeping is generally required for pervious pavement, but is prohibited for permeable point <br />pavers that use sand in the joints between pavers. <br />In addition to, or in support of, any routine maintenance activities identified here, pervious <br />paving products should be maintained in accordance with any manufacturer's instructions. <br />Where applicable, manufacturer's instructions/maintenance guidelines for pervious paving <br />products should be included as an attachment to this plan. <br />' Attached site plan must match the site plan exhibit to Maintenance Agreement. <br />Page 1 <br />REV: 01-23-20 PR <br />ATTY/AGR.2020.012/Valera Fooksman (Page 13 of 16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.