My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-09-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-09-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 6:18:07 PM
Creation date
9/17/2020 6:17:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/17/2020 6:18 PM
Modified:
9/17/2020 6:18 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.A. - Page 29 of 34 <br />• Burlingame, Campbell, Palo Alto, and San Jose included a similar exception. <br />• Staff recommends adopting Exception 5 as the Planning entitlement process can take multiple <br />years, particularly for large-scale projects that also require CEQA review. Due to significant time <br />and monetary investment necessary to obtain planning entitlements, imposing additional <br />building requirements after initial project design introduces additional project costs. <br />Note: <br />Projects entitled after Reach Codes adoption would be subject to all -electric requirements so the <br />window for this exception would be relatively small. <br />Exception 6 — All -Electric building requirements shall not apply to new residential structures that <br />designate 100% of the dwelling units to be affordable, excluding any onsite manager unit(s), for persons <br />earning 80% or less of the Area Median Income (AMI), as evidenced by instruments recorded against the <br />property that restrict the units as affordable for a period of at least 55 years. <br />• Affordable housing developments that are seeking tax credits and potentially other funding <br />source are subject to a maximum allowable cost per unit. The cost of constructing certain Reach <br />Codes requirements could potentially make projects ineligible to receive tax credits and other <br />funding, in turn making the project financially infeasible. <br />• The City's Affordable Housing Ordinance requires ownership developments to provide 15% of <br />total units as affordable units for moderate income households (120% of AMI). For rental <br />developments, 20% of total units must be provided as affordable - 5% for very -low income (50% <br />of AMI), 5% for low income (80% of AMI) and 10% for moderate income (120% of AMI). <br />However, developers can also propose alternative compliance options which have included <br />developing 100% affordable, standalone buildings in order to meet the Affordable Housing <br />Ordinance requirements. By establishing the exception for 100% affordable projects that <br />provide units at 80% AMI or below, this would encourage developers to exceed the City's <br />Affordable Housing Ordinance requirements and provide units at deeper affordability levels. <br />• Having an exception for affordable housing may not preclude all -electric affordable housing <br />developments as affordable housing developers have expressed support for all -electric <br />construction where feasible. Affordable housing developers would be encouraged to meet with <br />TRC, or similar design consultants, to address building electrification and design/cost issues. <br />• Exception 6 would be unique to Redwood City. Other cities, such as San Jose, have an exception <br />for buildings containing low or very low income units, but the exception specifically applies to <br />relaxed EV charging requirements. <br />• Staff recommends adopting Exception 6. The Bay Area continues to face an ever -worsening <br />affordable housing crisis. Creating housing, particularly affordable housing, is the City Council's <br />top strategic priority. This exception would help ensure that affordable housing projects <br />supporting the City's lowest income residents are not discouraged. While not a guarantee, <br />affordable housing developers have expressed interest in constructing all -electric buildings <br />when possible. <br />Exception 7 — All -electric building requirements would not apply to Accessory Dwelling Units (ADUs) or <br />Junior Accessory Dwelling Units (JADUs) as long as they are created through the conversion of existing <br />space. The requirements will apply to ADUs and JADUs that are created through new construction. <br />• An ADU/JADU is typically a second smaller residential dwelling unit that is constructed on the <br />same property as a primary larger residence. <br />• Requiring all -electric ADUs/JADUs within an existing space may require the existing residential <br />electrical service to be upgraded and is estimated to cost approximately $3,000. In addition, all - <br />Page 9 of 14 <br />mm <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www. redwood city.org <br />131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.