My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-09-21 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-09-21 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 6:18:07 PM
Creation date
9/17/2020 6:17:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/17/2020 6:18 PM
Modified:
9/17/2020 6:18 PM
Text:
http://www.redwoodcity.org/
ID:
2
Creator:
Created:
9/17/2020 6:18 PM
Modified:
9/17/2020 6:18 PM
Text:
https://webapps.redwoodcity.org/files/cd/Gatekeeper/901-El-Camino_Combined-(For-Website).pdf
ID:
3
Creator:
Created:
9/17/2020 6:18 PM
Modified:
9/17/2020 6:18 PM
Text:
https://webapps.redwoodcity.org/files/cd/Gatekeeper/601-Allerton_Combined-(For-Website).pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
350
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 8 of 21 <br />1. 901, 947, 999 EI Camino Real (Autozone site) <br />Project Description: The project is a mixed-use development with 154,000 square feet of office, 20-30 <br />units of on-site below market rate residential (level of affordability not indicated), and a 5,000 square foot <br />teen center. The proposed mixed-use building would be approximately 92 feet in height (8 stories) with <br />the office portion fronting EI Camino Real and the residential units facing Winklebleck and California <br />Street. The teen center is detached and would be a two-story building. The project proposes 404 parking <br />stalls with 3 levels of underground parking where the mixed-use project may require as many as 501 <br />parking spaces. The applicants would potentially pay the parking in -lieu fee for any parking deficit. <br />($25,000 per space). <br />• General Plan: Mixed -Use Downtown <br />• Zoning: P (Downtown Precise Plan) <br />• Existing Use: Retail (Autozone), Restaurant, and Surface Parking <br />Strategic Priorities: The project addresses the following Council Strategic Priorities: <br />• 20-30 below market rate units (Housing); <br />• 5,000 sq. ft. teen center (Children & Youth); <br />• Housing and jobs in close proximity to Caltrain and SamTrans (Transportation) <br />• Shared parking available to the public during non -business hours (Transportation) <br />Discussion: The proposed project is located in the DTPP and would require a General Plan Amendment <br />and DTTP amendment for additional office sq. ft. development and residential units. The on-site below <br />marking rate units would be integrated into the building and be operated by HIP Housing, however the <br />level of affordability and unit sizes have not been provided at this time. The teen center was designed in <br />collaboration with the City's Teen and Youth Advisory Board, and includes a study hall, multiple study <br />rooms, a computer station, and a roof patio. The applicant's proposal indicates that the City's Parks and <br />Recreation department would operate the teen center, however, the City's ability to operate the facility <br />would require additional analysis, particularly in light of the City's operating deficit. In addition to the <br />Strategic Priorities listed above, some office space would be made available for non-profit and community <br />use, and the building will target a LEED Gold or Platinum rating for sustainable building design and <br />construction. <br />2. 601 Allerton <br />Project Description: The project is a mixed-use development with 80,000 sq. ft. office, 8 units of on-site <br />below market rate housing (level of affordability not indicated), and a 540 sq. ft. retail space on the ground <br />floor. The proposed mixed-use building would be approximately 59 feet in height (5 stories) and the <br />residential units would face Allerton Street. In addition, the project also includes two levels of <br />underground parking, a publicly accessible pickle -ball court on the roof, and a 2,500 sq. ft. publicly <br />accessible clubhouse. <br />• General Plan: Mixed Use —Downtown <br />• Zoning: P (Downtown Precise Plan) <br />• Existing Use: Office (Social Security Administration Office and San Mateo County Probation <br />Pretrial Services) <br />Strategic Priorities: The project addresses the following Council Strategic Priorities: <br />Page 8 of 15 <br />.mmm . <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />
The URL can be used to link to this page
Your browser does not support the video tag.