My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-10-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-10-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 1:04:03 PM
Creation date
10/22/2020 5:08:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/26/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
878
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 55 of 176 <br />10/09/2020 <br />(b) SCOA Changes to Final Construction Documents. If SCOA or the General <br />Contractor (with SCOA's consent) seek to have changes made that alter the City -approved Final <br />Construction Documents or change the expected development costs as shown in the Final Design <br />and Construction Budget (defined in Section 10 below), SCOA will provide City with written <br />notice of the requested changes, a complete explanation of the requested changes, and any <br />revised Final Construction Documents or Final Design and Construction Budget (or both, as the <br />case may be) for City's approval, which shall not be unreasonably withheld, conditioned or <br />delayed. Reasons for such requests from SCOA for changes to the City -approved Final <br />Construction Documents shall include (by way of example and without limitation) (i) damage <br />from causes beyond control of SCOA or the General Contractor and not covered by insurance, <br />(ii) changes in FEMA standards, (iii) discovery of concealed or unknown conditions, (iv) <br />remediation of Hazardous Materials, if any, discovered in a subsequent investigation pursuant to <br />Section 9, and (v) defects in or failure of materials or equipment and defects in or failure of work <br />resulting from design parameters or means or methods of construction, any of which is specified <br />for use by City or any City representative and specifically shown in and expressly required by <br />the Final Construction Documents or Construction Contract (as defined in Section 12(c)). Upon <br />City's approval of the proposed changes, which approval will not be unreasonably withheld, the <br />Final Construction Documents, the Final Design and Construction Budget or both (as the case <br />may be), shall be changed or adjusted accordingly. <br />(c) City Changes to Final Construction Documents. If the City requires reasonable <br />changes that alter the Final Construction Documents or change the expected development costs <br />as shown in the Final Design and Construction Budget (or both), following notice and receipt of <br />such reasonable changes requested by the City, SCOA will provide City with revised Final <br />Construction Documents with changes consistent with City's reasonable requirements and any <br />proposed revision to the Final Design and Construction Budget (or both, as the case may be) for <br />City's approval, which will not be unreasonably withheld. <br />(d) Seaport Project Committee. SCOA and City will take all necessary steps within <br />their control to reach agreement within 14 calendar days with respect to any proposed changes <br />pursuant to Subsections 3(b) and (c) above. To expedite decisions on proposed changes, SCOA <br />and City, prior to start of construction of the Levee Improvements work, will each designate a <br />representative to meet and confer on such proposed changes with the objective of submitting a <br />joint recommendation to the Parties on the proposed changes. To facilitate such expedited <br />decisions, SCOA, BKF and City agree to form the "Seaport Project Committee" which Seaport <br />Project Committee shall be comprised of five members; two members from StonyBrook <br />Associates, Inc. (authorized representatives of SCOA), two members from BKF, and one <br />member from the City, which shall be the City Engineer or his or her designee ("Designated <br />City Official"). Accordingly, throughout the construction of the Levee Improvements, the City <br />shall actively participate as a member of the Seaport Project Committee. <br />4. Community Facilities District. <br />(a) Community Facilities District; Formation. Pursuant to the City's Local Goals and <br />Policies, and the Code which incorporates the Mello -Roos Act, the Parties shall cooperate in <br />good faith to establish the CFD to fund the City's acquisition of the Levee Improvements and the <br />maintenance of the New Levee, as well as ongoing maintenance of the Seaport Centre Wet <br />OAK #4819-4834-1908 v19 8 <br />ATTY/AGR/2020.230/SEAPORT LEVEE AGREEMENT <br />237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.