My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-10-26 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-10-26 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 1:04:03 PM
Creation date
10/22/2020 5:08:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/26/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
878
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 65 of 176 <br />10/09/2020 <br />and <br />Cornerstone Structural Engineering Group (Structural Design). <br />The following contracting and bidding procedures will apply to all construction activity <br />relating to the Levee Improvements: <br />(a) Prior to or upon City's adoption of the CFD formation resolution described in <br />Section 4(a), SCOA will prepare and submit to the Designated City Official for review and <br />comment in the report(s) therein described a bid package that includes: (i) bidding and <br />procurement information describing the time, place and conditions of competitive bidding, <br />including bidding or proposal forms; (ii) the list of proposed bid package recipients; (iii) the <br />form of bid notice; (iv) the form of agreement between SCOA and General Contractor; (v) the <br />conditions of the contract for construction (general, supplementary and other conditions) and <br />general requirements (if any); (vi) bond forms (performance, labor and materials, and warranty); <br />(vii) a statement of bidder qualifications; and (viii) such other items as may be reasonably <br />requested by City. The Designated City Official will, within a reasonable time period, and in no <br />event more than ten (10) days from receipt of the items listed in the immediately preceding <br />sentence (and in the event the Designated City Official fails to respond within such 10- day time <br />period, the SCOA shall be entitled to an extension of time as set forth in Section 25(a) below), <br />respond with any comments, SCOA will endeavor to address all such comments and will <br />incorporate the Designated City Official's reasonable proposed changes in the bid package <br />documents, and the SCOA and Designated City Official will confirm in writing their mutual <br />approval of the final bid package documents to be submitted to City with the report(s). The final <br />bid package documents as approved by City shall be referred to as the "Final Bid Package <br />Documents". Accordingly, upon establishment of the Final Bid Package Documents, the Parties <br />agree to affix the Final Bid Package Documents to this Agreement as Exhibit I. <br />(b) Prior to proceeding as specified in Subsection 12(c) below, (i) SCOA will have <br />obtained all land use entitlements, permits and licenses as provided in Section 7, except that the <br />Levee Improvements may be constructed in phases as warranted to coincide with the issuance of <br />the respective permits and the Levee Improvements may be bid and the Construction Contract <br />structured accordingly; and (ii) prior to awarding the Construction Contract, SCOA will provide <br />City with proof of availability of sufficient funds to complete the Levee Improvement work in <br />accordance with the Final Design and Construction Budget. <br />(c) SCOA shall provide notice of the competitive bid process to and obtain <br />competitive bids from a minimum of three (3) qualified bidders. SCOA shall mail notices <br />inviting formal bids to the recipients approved by the Designated City Official or his or her <br />designee. The notices shall be distributed (by mail or electronic mail) no less than thirty (30) <br />calendar days before the opening date of the bids. The notices shall distinctly describe the Levee <br />Improvements project and state the time and place for submission of bids. Bids shall be <br />submitted to SCOA either via hard copy or email. The bids shall be received and opened by <br />SCOA and there shall be no requirements for a public bid opening. After the bids are received <br />and opened by SCOA, SCOA may contact one or more of the bidders and request clarification of <br />any bid or adjustments to the bid to comply with the specifications for the Levee Improvements, <br />including the City -approved Final Bid Package Documents so that all bids may be evaluated on a <br />comparable basis. The contract for the construction of the Levee Improvements ("Construction <br />OAK #4819-4834-1908 v19 18 <br />ATTY/AGR/2020.230/SEAPORT LEVEE AGREEMENT <br />247 <br />
The URL can be used to link to this page
Your browser does not support the video tag.