My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Sensus Metering Systems
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Sensus Metering Systems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 12:33:41 PM
Creation date
4/1/2008 11:05:39 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Sensus Metering Systems
PROJECT NAME
Remote Meter Reading Equipment
RMP File Number
304
Date
3/17/2008
MO Ref
MO 08-34
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />General Responsibilities: <br />Sensus Metering Systems will: <br /> <br />1. Provide a Project Manager to coordinate all FlexNet installation activities with the <br />customer. The Project Manager will be the primary point of contact between the <br />customer and Sensus during deployment. The Project Manager will also coordinate <br />all installation activities with the Sensus field engineers and any TGB installation <br />crews hired by Sensus. <br />2. Conduct a propagation study to determine the locations best suited for TGB <br />installation based on the goals of the project. <br />3. Hire a qualified installation contractor to install the TGB equipment and install all <br />appropriate cabling between the TGB antenna and the TGB cabinet. <br />4. Commission the RNI hardware and software, and provide training to operate the <br />FlexWare software. <br />5. Ensure the TGB and RNI installed properly and are operating within proper <br />parameters. <br />6. Advise customer IT personnel on proper care and maintenance of the FlexNet <br />hardware (TGB and RNI hardware). <br /> <br />The Customer will: <br /> <br />1. The Customer will provide a key point of contact to help coordinate customer <br />activities with the Sensus Project Manager during the system installation process. <br />2. The Customer will be responsible to provide the network infrastructure in the Power <br />and RNI Location areas in Diagram 1, including network cabling and power identified <br />in blue in Diagram 1. <br />3. The Customer will be responsible for monthly fees associated with the network <br />access for all sites where network access is needed. <br />4. The Customer will be responsible to provide a high-speed Network communications <br />(TCPIIP) link between the Regional Network Interface (RNI) and TGB. <br />5. The Customer will purchase any routers, hubs, mounting equipment, uninterruptible <br />power supply and/or security equipment needed to connect the RNI to the <br />customer's internal network. <br />
The URL can be used to link to this page
Your browser does not support the video tag.