My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
11/5/2020 6:33 PM
Modified:
11/5/2020 6:33 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 1 of 16 <br />/<�ik <br />Redwood <br />CitylCallifornia <br />Faunded 1867 <br />A,&/ <br />DATE: November 9, 2020 <br />SUBJECT <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />Study Session on potential Bayfront Park and County Navigation Center <br />RECOMMENDATION <br />Hold study session. <br />STRATEGIC PLAN GUIDING PRINCIPLE <br />Healthy Community for All, Housing and Transportation <br />BACKGROUND <br />Over the past three years, the City and the County of San Mateo have discussed a potential property <br />exchange of two properties in the Inner Harbor area of the City. For the City of Redwood City, this <br />exchange would allow Phase 1 construction of the Blomquist Street Extension. The Extension consists of <br />extending Blomquist Street from Maple Street to Bair Island Road through a vehicular bridge. Extending <br />Blomquist Street is identified in the Citywide Transportation Plan, rwcMoves, as a key project to improve <br />circulation east of 101 and creates additional access for residents to enjoy the waterfront. This Extension <br />meets identified goals of network gap closure, connectivity and safety. Creating a second access point to <br />the Bair island neighborhood will enhance emergency response times, improve livability for the residents, <br />and improve overall access to and from the area. This improvement is critical for both existing and future <br />uses in the area. The Blomquist Extension is designed to support neighborhood traffic needs, which <br />includes traffic calming elements. <br />The construction of the Blomquist Extension would require the demolition of an existing County facility <br />currently servicing a shelter for persons experiencing homelessness, so the County of San Mateo would <br />require a new location for its existing services. Acquisition of a new site would present future <br />Page 1 of 13 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.ore <br />141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.