My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Multimodal Circulation and Connectivity <br />South Main Mixed -Use supports multimodal circulation and <br />connectivity through: <br />• Lathrop Street to pedestrian and bicyclist street with traffic calming <br />• Closing Shasta Street to vehicle traffic between Chestnut Street and Main <br />Street to create a pedestrian plaza. <br />• Adding a bicycle/pedestrian walkway: <br />• West side of the Caltrain tracks between Chestnut Street and the <br />existing dog park. <br />• South of Maple Street between EI Camino Real and Lathrop Street. <br />• Realigning Beech and installing additional traffic control to assist <br />pedestrians in crossing EI Camino Real. <br />• Adding a Class IV cycle track on EI Camino Real along the Project frontage <br />CEL NOT CuRRENTLY <br />CCONTROLLED BY GREYSTAR , <br />g�PROPOSED AnoN <br />CLASS IV CYCLE TRACK] 1MS� <br />y � <br />00 Jv O \ \ , �5q '\ �• <br />Tt <br />°�••• •• `O V <br />CLASS IV CYCLE TRACK pOy �— <br />\/ <br />\ BUS ROUTE/TRUCK RCS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.