My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />February 28, 2020 <br />Page 5 <br />traffic congestion at intersections where appropriate, and must do so where, as here, such traffic <br />congestion will cause significant impacts on air quality, noise, and safety issues caused by <br />traffic. (Pub. Res. Code § 21099(b)(3).) <br />The Project site is located in an area that has experienced a drastic impact in traffic over the last <br />ten to fifteen years as the City has continued to approve of newer commercial, office, and <br />residential land uses. The Project site's neighborhood, which is located on the periphery of the <br />City's downtown core, is also one of the most heavily traversed areas in Redwood City. <br />According to the City's General Plan, El Camino Real (State Route 82), off of which both the <br />Sequoia High School and the Project sites are located, is one of the few major boulevards in the <br />City, and serves as a regional route connecting San Jose and San Francisco.' El Camino Real <br />already suffers from substantial vehicular congestion, which produces noise, exhaust fumes, and <br />pollution.2 Further, a trend currently exists where commuters along El Camino Real seek less - <br />congested travel paths in the residential neighborhoods to the north and south of the boulevard, <br />resulting in speeding and dangerous traffic conditions in those neighborhoods, including those <br />residential neighborhoods surrounding the Sequoia High School.3 Acknowledging these issues, <br />the City's General Plan provides that El Camino Real "will be updated to facilitate walkable <br />linkages between Sequoia High School, the transportation center at the Caltrain Station, and <br />Downtown Redwood City."4 <br />The construction of and traffic generated by the Project, and especially as modified, will <br />severely exacerbate the already stifling traffic in the general area, and the safety issues <br />posed thereby. These impacts will severely inhibit the District's abilities to operate its <br />educational programs, including at Sequoia High School. <br />The proposed Project is anticipated to impede circulation in the neighborhoods surrounding <br />Sequoia High School, and clog the access roads to, from, and around the District's high school. <br />(See, 5 Cal. Code Regs. § 14010(k), which requires that school facilities be easily accessible <br />from arterial roads.) As discussed, the Project's Parcels A-E and Parcel F are located <br />approximately 0.8 and 0.6 miles southeast of the District's Sequoia High School, respectively. <br />Thus, both Sequoia High School and the Project site will be accessed by the same roads. Per the <br />Initial Study, the proposed Project, before the residential component was almost doubled in size, <br />would cause the traffic volumes at the Project's site to increase by 630 vehicles and 535 vehicles <br />during the AM and PM peak hours, respectively. It is anticipated that the Project will draw <br />hundreds of additional office workers and residents to the area. This substantial influx of new <br />vehicles and residents will severely exacerbate the already stifling traffic in the neighborhood <br />and the safety issues posed thereby, including by further diverting traffic away from El Camino <br />Real and into the residential neighborhoods surrounding Sequoia High School. <br />Redwood City General Plan (October 11, 2010), p. BE -25 <br />z Id. at Figure BE -14; pp. BE -106 and BE -131. <br />' Id. at p. BE -134. <br />° Redwood City General Plan (October 11, 2010), p. BE -25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.