My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan, Principal Planner <br />City of Redwood City, Planning Services <br />February 28, 2020 <br />Page 7 <br />several other projects that are being considered by the City, including the 150 Charter Street <br />project (72 residential units), and the 1125 Arguello Street project (68 townhomes), all of which <br />promise to drastically increase traffic in the neighborhood and District. <br />Each of these projects alone promises to drastically increase traffic in the neighborhood, <br />resulting in air quality, noise, and safety issues for District families and staff attending Sequoia <br />High School. When considered together, their collective impacts on traffic, safety, and air <br />quality in the neighborhood will be devastating. The impacts of the Project must be analyzed <br />in conjunction with the anticipated impacts of all the other development being considered <br />and approved in this area. <br />Noise <br />7. Identify any noise sources and volumes which may affect school facilities, <br />classrooms, and outdoor school areas. <br />The City's original NOP included noise as one of the topics to be analyzed in the Project EIR. <br />The City's revised NOP has, without explanation, removed noise as a topic to be analyzed. The <br />District strongly objects to the City's disregard of noise impacts. <br />The City's disregard of noise impacts is based on an Initial Study which assumes that only 291 <br />residential units would be constructed as part of the Project. (See Initial Study, p. 4.13-11, which <br />describes anticipated increases in traffic caused by the Project.) As this assumption has changed <br />and the Project's residential component has increased in scope, it would be improper for the City <br />to disregard potential impacts of the Project without having adequately identified or analyzed <br />these impacts. Further, the Initial Study did not specifically consider whether noise generated <br />from construction and operation of the Project will cause significant impacts on the District's <br />educational program at Sequoia High School. Rather, the entire Initial Study is based on the <br />incorrect assumption that the District's Sequoia High School is located 1.5 miles away from the <br />Project site. <br />Request No. 7 is intended to clarify that the EIR's consideration of noise issues takes into <br />account all of the various ways in which noise may impact schools, including increases in noise <br />levels in the immediate vicinity of Sequoia High School. <br />Air Quality <br />8. Identify and assess the direct and indirect air quality impacts of the Project <br />on sensitive receptors, such as the District's Sequoia High School. <br />9. Identify and assess cumulative air quality impacts on schools and the <br />community in general resulting from increased vehicular movement and <br />volumes expected from additional development already approved or pending <br />in the City and Project neighborhood. <br />
The URL can be used to link to this page
Your browser does not support the video tag.