My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2020 8:53:43 AM
Creation date
11/5/2020 6:29:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
11/9/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
883
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lozano Smith <br />Harold M. Freiman <br />Attorney at Law <br />July 13, 2020 <br />By U.S. Mail & E -Mail: lchan@redwoodcity.org <br />Ms. Lindy Chan, Acting Planning Manager <br />City of Redwood City, Planning Services <br />1017 Middlefield Road, <br />Redwood City, CA 94063 <br />E-mail: hfreiman@lozanosmith.com <br />Re: Response of Sequoia Union High School District to Draft Environmental Impact Report <br />for the South Main Mixed -Use Project <br />Dear Ms. Chan: <br />This office represents Sequoia Union High School District ("District"). On behalf of the District, <br />we are hereby submitting comments regarding the Draft Environmental Impact Report ("Draft <br />EIR") prepared by the City of Redwood City ("City") for the project to be located on five <br />contiguous blocks totaling 8.30 acres between El Camino Real, Maple Street, Cedar Street, and <br />Main Street ("Parcels A-E"), and one separate, 0.15 -acre block located at 1304 El Camino Real <br />(at Jackson Avenue) ("Parcel F"), in Redwood City, California (collectively, the "Project"). <br />According to the Draft EIR, the proposed Project, sponsored by Greystar LLC ("Developer"), <br />will consist of the demolition of existing auto storage and repair, restaurant, and office uses, the <br />construction of 540 multi -family residential units, 530,000 square feet ("sf') of office uses, an <br />8,400 sf childcare facility, and 29,000 sf of retail uses. The Project's Parcels A-E and Parcel F <br />are located approximately 0.6 and 0.4 miles southeast of the District's Sequoia High School and <br />Administrative Office, respectively. t <br />The Draft EIR does not comply with the California Environmental Quality Act ("CEQA," Pub. <br />Res. Code §§ 21000, et seq.) and its implementing regulations (Cal. Code Regs., tit. 14, <br />§ § 15000, et seq., "CEQA Guidelines"), for both technical and substantive reasons. Moreover, <br />the Draft EIR, based on an improper interpretation of Senate Bill (SB) 50, does not include <br />sufficient information to evaluate potential environmental impacts both to schools, and related to <br />schools. Through this letter, the District wishes to emphasize that this Project has the <br />potential to have a profound negative effect on the District's students, their families, and <br />residents who will reside in and near the Project. <br />1 This information was obtained using the "Measure Distance" tool on Google Maps: <br />https://www. google. com/maps/place/Sequoia+High+School/@3 7.483 8677,- <br />122.233779,17z/data=!4m5!3m4! lsOx8O8fa24cace42deb:OxfcObb78e2Ob66f77!8m2!3d37.4848468!4d- <br />122.2370459 <br />Limited Liability Partnership <br />2001 North Main Street, Suite 500 Walnut Creek, California 94596 Tel 925-953-1620 Fax 925-953-1625 <br />
The URL can be used to link to this page
Your browser does not support the video tag.