My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-11-16 Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-11-16 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 10:54:32 AM
Creation date
11/12/2020 6:50:43 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
11/16/2020
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
11/12/2020 6:53 PM
Modified:
11/12/2020 6:53 PM
Text:
mailto:nmurguia@redwoodcity.org
ID:
2
Creator:
Created:
11/12/2020 6:53 PM
Modified:
11/12/2020 6:53 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.32TILI
ID:
3
Creator:
Created:
11/12/2020 6:53 PM
Modified:
11/12/2020 6:53 PM
Text:
http://permits.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
820
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S.A. - Page 89 of 302 <br />Construction -Related Activities <br />83. Verification for Dimensions — All dimensions, including building location on the site, setbacks, <br />building height, etc. shall be verified by a licensed surveyor. A survey report shall be provided to the <br />Building Inspector for review and approval. [COA][BUILDING] <br />84. Sales and Use Taxes — Applicant shall use good faith efforts to register with the Board of <br />Equalization to create an ID prior to project construction and operation. This maximizes the City's <br />allocation of sales and use taxes associated with project construction. Contact Nancy Murguia, <br />Finance Department, at (650) 780-7097 or.nmurguia@redwoodcity.org. [COA][FINANCE] <br />85. Hours of Construction — On -Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. <br />Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere <br />to the City's Noise Ordinance. If possible, the noisiest construction activities would be scheduled <br />for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] <br />86. Construction Sign - Prior to the start of any construction work, including demolition, install at least <br />one 36" x 48" (minimum) construction sign in a visible location along the project frontage for the <br />duration of construction. The sign shall include, at minimum, the following information: project <br />name & address, elevation or rendering, construction manager (name, phone number), anticipated <br />completion (season, year), and the City's permitting website http://permits.redwoodcity.org <br />[COA][PLANNING] <br />87. Construction Meetings —The applicant is required to contact the Permit Counter (650.780.7350) to <br />schedule the following meetings prior to or during construction. [COA][BUILDING] <br />a. Pre -Construction - After City permits are issued, but prior to start of construction, <br />schedule a pre -construction meeting with Engineering, Building, Fire, and Planning <br />staff to discuss the inspection process and requirements for construction and site <br />work. The applicant shall arrange for the attendance of the owner, developer, <br />construction manager, contractor, and all subcontractors who are responsible for <br />grading and erosion and sedimentation protection controls. <br />b. For Affordable units on-site - Interior Finishes & Amenities - After sheetrock <br />inspection but prior to installation, contact the Project Planner and Housing Staff to <br />verify, to the City's satisfaction, that all interior finishes and amenities in the <br />affordable units are equivalent to amenities used in market rate units. <br />88. Materials Mock -Up — Prior to final foundation inspection, prepare a mock-up for each building that <br />is outdoors, readily accessible, and will remain intact until the project has reached substantial <br />completion. Each mock-up should include all project colors and materials, windows for the base and <br />top, balconies, lighting, and architectural details, as well as construction details, such as the weep <br />screed, to understand how the design addresses them. Then schedule a mock-up meeting with the <br />Planning Division for final review and approval of the project details. Submit an updated colors and <br />materials board or details if any changes are made as a result of the mock-up meeting. <br />[COA][PLANNING] <br />89. Certification Letters - Prior to final inspection, submit certification letters from the following <br />architects verifying that the project, as constructed, complies with approved plans. After the <br />certification letter has been submitted, the project planner will also confirm substantial compliance <br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT— ENTITLEMENT <br />REV: 11-03-2020 PR <br />Page 35 of 38 <br />92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.