Modifications. In the event that (1) the applicant fails to secure fee title interest in the Shasta <br />Triangle or the litigation is unreasonably delayed such that construction activities that require Final <br />Map recordation cannot proceed, or (2) the Shasta Right of Way Vacation is not approved under <br />the alternative procedure set forth above, then in either situation the applicant may seek a <br />modification pursuant to Condition 108 (Modifications) for consideration of conveying title, <br />abandoning the right-of-way and recording an access and maintenance agreement after the Final <br />Map recordation, or modifying the plans for the open space plaza, all subject to approval by the <br />Community Development and Transportation Director. [COA][ENGINEERING] <br />Reports and Surveys <br />32. Geotechnical Report - Include a geotechnical field review and reports for all grading work, prepared <br />by a licensed geotechnical engineer and in conformance with Engineering Standards, Volumes II & <br />III, CBC, and other State regulations. This shall be submitted as part of the building permit <br />application. [SDR][ENGINEERING] <br />33. As-Builts — Provide "as -built" or "record" drawings, to be submitted in paper, PDF and AutoCAD <br />formats prior to project sign -off. [COA][ENGINEERING] <br />34. Transportation Demand Management Program — A final Transportation Demand Management <br />(TDM) program, describing the elements to be implemented, shall be reviewed and approved prior <br />to final certificate of building occupancy. The TDM program shall include an annual reporting <br />requirement that details daytime parking utilization rates and employee use and awareness of the <br />program. Annual reporting shall begin on December 1 of each year. [COA][ENGINEERING] <br />35. Valet Parking — A Valet Parking Plan must be submitted for the office uses (Parcels B, C, and E) prior <br />to building permit issuance. It shall identify how the valet operation will be conducted, the number <br />of vehicles that can be accommodated, and an estimated cost of the operation. <br />a. If the full 425 parking spaces in Parcels B, C, and E are infeasible, the applicant shall revise <br />the building plans to accommodate the full number of parking space and obtain additional <br />discretionary approvals as determined by the City. <br />b. All valet parking attendants working on-site must park their private vehicles on the project <br />site and not utilize public street parking spaces. Valet attendants are encouraged to <br />participate in the TDM program and use alternative modes of transportation. <br />C. Valet parking program is required for the life of the project. Any request to remove the <br />valet parking program will require approval of the City Council. Removal of the valet <br />parking program may require additional environmental analysis. <br />d. The valet parking staff shall re -park vehicles located in the drive aisles into parking stalls <br />once stalls become available. [COA][ENGINEERING] <br />FEMA and Base Flood Elevations <br />36. Elevation Certificate — If all or a portion of the site is within a Special Flood Hazard Area (as shown <br />on the latest FEMA Flood Insurance Rate Maps in effect at building permit issuance), upon <br />completion of the structure, the elevation of the lowest floor (including basement when applicable) <br />ATTY/RESO.0125/PC RESO SOUTH MAIN MIXED USE PROJECT—ENTITLEMENT RESO. NO. 15908 <br />REV: 11-03-2020 PR MUFF NO. 601 <br />Page 23 of 38 <br />