all matters relating to the Contract Documents. If Project Manager is an employee of City, <br />Project Manager is the beneficiary of all Contractor obligations to City including, without <br />limitation, all releases and indemnities. <br />B. Project Manager shall have final authority over all matters pertaining to the Contract <br />Documents and shall have sole authority to modify the Contract Documents on behalf of <br />City, to accept work, and to make decisions or actions binding on City, and shall have sole <br />signature authority on behalf of City. <br />C. City may assign all or part of the Project Manager's rights, responsibilities and duties to a <br />Construction Manager, or other City Representative. <br />3.02 CONTRACTOR'S PROJECT MANAGER AND OTHER KEY PERSONNEL <br />A. Contractor has designated r ►t�yy)dtn OwA.4 1 as its Project Manager to <br />act as Contractor's Representative in all matterd relating to the Contract Documents. <br />B. Contractor has designated the following other Key Personnel for the Project: <br />ppName Position <br />1�I[ Superintendent [See Doc. 00 7200 Para. 8.01.6] <br />Project Engineer <br />ARTICLE 4 LIQUIDATED DAMAGES FOR DELAY IN COMPLETION OF WORK <br />4.01 LIQUIDATED DAMAGE AMOUNTS <br />A. As liquidated damages for delay Contractor shall pay City One Thousand, Five Hundred <br />dollars ($1,500.00) for each Day that expires after the time specified herein for Contractor <br />to achieve Substantial Completion of the entire Work, until achieved. <br />B. As liquidated damages for delay Contractor shall pay City Five Hundred dollars ($500.00) <br />for each Day that expires after the time specified herein for Contractor to achieve Final <br />Completion of the entire Work, until achieved. <br />4.02 SCOPE OF LIQUIDATED DAMAGES <br />A. Measures of liquidated damages shall apply cumulatively. <br />B. Limitations and stipulations regarding liquidated damages are set forth in Document <br />00 7200 (General Conditions). <br />ARTICLE 5 LIQUIDATED DAMAGES FOR UNAUTHORIZED CHANGES OF KEY <br />PERSONNEL <br />5.01 Liquidated Damage Amounts <br />A. Contractor and City agree that the Key Personnel listed in Contractor's Statement of <br />Qualifications (Document 00 4513) were a material factor in City's assessment of <br />Contractor's experience and the adequacy of Contactor's supervisory personnel. <br />Accordingly, Contractor and City agree that Contractor shall not remove, reassign or make <br />changes to any of the Key Personnel without City's prior written approval. In the event that <br />AGREEMENT 005200-2 <br />2019-2020 WATERMAIN REPLACEMENT PROJECT -ARLINGTON NEIGHBORHOOD <br />