My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Union Pacific Railroad Co. UPRR
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Under 60K
>
Agmt20 Union Pacific Railroad Co. UPRR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2020 4:19:55 PM
Creation date
12/15/2020 3:59:52 PM
Metadata
Fields
Template:
Agreement
Contractor Name
UPRR, Union Pacific Rail Road
PROJECT NAME
Crossing Improvements Project 770442
RMP File Number
304.5
Date
11/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
herein. Prior to commencing the Agency Work, and if the performance of any Agency Work <br />requires any person or equipment to be within twenty-five (25) feet of any track, Agency shall <br />provide Railroad at least thirty (30) working days advance notice of the performance of such <br />proposed work, and upon Railroad's receipt of such notice, Railroad will determine and inform <br />Agency whether a flagman need to be present or whether Agency needs to implement any <br />special protective or safety measures. Subject to Exhibit D, in the event that flagging or other <br />special protection or safety measures are required to be performed in connection with the <br />Railroad Work specifically or the Project generally, and regardless if the costs for such <br />measures are included in the Estimate, Agency shall be responsible for all such costs incurred <br />in connection therewith. <br />6. Prior to commencing any Agency Work, Agency shall telephone (or shall cause <br />its contractor or agent to telephone) Railroad during normal business hours (7:00 a.m. to <br />9:00 p.m., Central time, Monday through Friday, except holidays) at 1-800-336-9193 to <br />determine if fiber optic cable is buried anywhere on Railroad's property to be used in connection <br />with the Agency Work. If fiber optic cable is present, Agency, at its sole cost, will coordinate (or <br />will cause its contractor or agent to coordinate) with the applicable telecommunications <br />companies for the relocation or other protection of the fiber optic cable prior to beginning any <br />Agency Work. <br />7. Agency, for itself and for its successors and assigns, hereby waives any right of <br />assessment against Railroad, as an adjacent property owner, for any and all improvements <br />made under this Agreement. <br />8. Neither party shall assign this Agreement without the prior written consent of the <br />other party, which consent shall not be unreasonably withheld, conditioned or delayed. <br />9. This Agreement sets forth the entire agreement between the parties regarding <br />the Project and the installation and maintenance of the Project improvements within the <br />Crossing Area. To the extent that any terms or provisions of this Agreement regarding the <br />installation and maintenance of such Project improvements are inconsistent with the terms or <br />provisions set forth in any existing agreement affecting the Crossing Area, such terms and <br />provisions shall be deemed superseded by this Agreement to the extent of such inconsistency. <br />IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of <br />the Effective Date. <br />CITY OF REDWOOD CITY, CALIFORNIA <br />Signature <br />Melissa Stevenson Diaz <br />Printed Name <br />City Manager <br />Title <br />AT <br />Pamela Aguilar, City Clerk <br />2 <br />UNION PACIFIC RAILROAD COMPANY, <br />a Delaware Corporation <br />Signature <br />Peggy Ygbuhay <br />Printed Name <br />Manager I, Engineering - Public Projects <br />Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.