My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-12-21 Amended Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-12-21 Amended Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 12:51:59 PM
Creation date
12/18/2020 5:45:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1000
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 162 of 272 <br />164 <br />1 TOTAL 3 -YEAR BASE PRICE APGS. Hardware for Library Lot C only <br />S19.513.78 <br />ITEM 4 <br />APGS VMS for Library Lot C only QMNYITY UNIT PRICE <br />TOTAL PRI CE O ptional Vendor Nates to Pr icing <br />165 <br />VM S Signs) for Lot - describe location(s) and details in proposal and summarize in Notes to Pricing at <br />Fight end of this row <br />166 <br />Complete turnkey VMS Sign Installation, including all civil work, electrical work, and mounting <br />167 <br />Sign Freight <br />168 <br />Sign Sales Tax <br />169 <br />JAIIAdditionalE ui mentCabinets Junction Boxes etc. forSi na e <br />170 <br />1 TOTAL 3 -YEAR BASE PRICE VMS Signage, for Library Lot C only <br />S10.553.901 <br />ANY OTHER REQUIRED EQUIPMENT RECURRING SW FEES OR OTHER COSTS - Library Lot C <br />171 <br />Space Management Solution O ex 3 ears <br />172 <br />173 <br />174 <br />175 <br />176 <br />TOTAL Additional Items <br />177 <br />THREE-YEAR TOTAL -Library Lot C <br />$32,940.47 <br />ITEM # <br />APGS Hardware/Software for Main Street Lot owuvrrrY <br />UNIT PRICE <br />TOTAL PR ICE Optional Vendor Notes to Pricing <br />178 <br />Sensors for Ent /Exit Plaza Counting Points fors stems that count vehicles in motion <br />179 <br />Sensors for I ndividual Vehicle Counting,fors stems that taunt vehicles at rest <br />180 <br />Delineators (e.g. bollards raised bums etc. as required <br />181 <br />Powerandcommunication conduitand wiring from demarcation tocomponents <br />182 <br />Lot Level Controller and associated equipment <br />183 <br />System Server Weatherproof Enclosures etc. list details on VendorUse tab <br />184 <br />APGS Software, Operating Software, Anti -Virus Software, etc. for Server <br />185 <br />Laborfor complete turnkey installation and project management of Items above, including all civil and <br />electrical work and equipment mountin <br />186 <br />Frei ht <br />187 <br />Sales Tax <br />188 <br />TOTAL 3 -YEAR BASE PRICE APGS Hardware for Main Street Lot <br />ITEM# <br />APGSVMSfor Main Street Lot onl CWANYITY <br />UNIT PRICE <br />TOTAL PRI CE O ptionaIVendor NotestoPrici <br />189 <br />VMS Signs} for Lot - describe location(s) and details in proposal and summarize in Notes to Pricing at <br />right end of this row <br />190 <br />Compfete turnkey VMS Sign Installation, including all civil work, electrical work, and mounting <br />191 <br />5i n Frei ht <br />192 <br />5i n Sales Tax <br />193 <br />IAIIAdditionalE ui mentCabinets Junction Boxes etc. forSi na e <br />194 <br />1 TOTAL 3 -YEAR BASE PRICE VMS Signage, for Main Street Lot and <br />ANY OTHER REQUIRED EQUIPMENT RECURRING SW FEES OR OTHER COSTS - Main Street Lot <br />195 <br />5pace Management Solution O ex 3 ears <br />196 <br />197 <br />198 <br />155 <br />316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.