My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2020-12-21 Amended Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2020
>
AgdaPkt 2020-12-21 Amended Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2021 12:51:59 PM
Creation date
12/18/2020 5:45:35 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1000
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.E. - Page 164 of 272 <br />200 TOTAL Additional Items <br />201 THREE-YEAR TOTAL -Main Street Lot <br />ITEM n APGS Hardware/Soft ware for Winslow Street Lot <br />202 Sensors for Ent /Exit Plaza Counting Points fors stems that count vehicles in motion <br />203 Sensors for I ndividual Vehicle Counting,fors stems that count vehicles at rest <br />204 Delineators (e.g. bollards raised bumps,etc. as required <br />205 Powerand communication conduit and wiringfrom demarcation tocomponents <br />206 Lot Level Controller and associated equipment <br />207 System Server Weatherproof Enclosures etc. list details on Vendor Use tab <br />208 APGS Software, Operating Software, An&Virus Software, etc. for -Server <br />209 Laborforcomplete turnkey installation and project management of Items above, induding all civil and <br />electrical work and eauioment mounting <br />Sa les Tax <br />TOTAL 3 -YEAR BASE PRICE. APGS Hardware, for Winslow Stre <br />ITEM # APG5 VMS for Winslow Street Lot onl <br />213 VM S Sign(s) for Lot - describe location(s) and details in proposal and summarize in Notes to Pricing at <br />right end of this row <br />214 Complete turnkey VMS Sign I nstallation, including all civil work, electrical work, and mounting <br />Sales Tax <br />-110Vigo] 11:I4.111 <br />219 Space Management Solution <br />220 <br />221 <br />222 <br />224 <br />225 <br />IIN4r»41Uiau14k,kM 7:180,1.1711,reVI Aa4*S41.11011:I4:l <br />TOTAL Additional Items <br />THREE-YEAR TOTAL -Winslow Street Lot <br />ITEM u 1 APGS Hardware/Software for Perry Street Lot <br />228 Delineators (e.g. bollards raised bums etc. as required <br />229 Powerand communication conduit and wiringfrom demarcation tocomponents <br />230 Lot Level Controller and associated equipment <br />231 System Server Weatherproof Enclosures etc. list details on Vendor Use tab <br />232 APGS Software, Operating Software, Anti -Virus Software, etc. for -Server <br />233 Laborfor complete turnkey installation and project management of Items above, including all civil and <br />electrical work and equipment mountin <br />234 Freight <br />157 <br />318 <br />$34,699.52 <br />QUANTITY UNIT PRICE <br />TOTAL PRICE <br />Optional Vendor Notes to Pricing <br />A Lot <br />QUANTITY UNIT PRICE <br />TOTAL PRI CE <br />O al Vendor Nates toPrici <br />)t only <br />ZOSTS - Winslow Street Lot <br />I <br />$25,226.58 <br />CKJANniY UNIT PRICE <br />TOTALPRJCE <br />Optional Vendor Nates to Pricing <br />157 <br />318 <br />
The URL can be used to link to this page
Your browser does not support the video tag.