Laserfiche WebLink
Pervious Pavement Maintenance Plan Dateof Inspection: <br />Property Address: Treatritent Measure Pio.: <br />Table 1 <br />Routine Maintenance Activides for Pe" , pus Pavement Areas <br />No. <br />Maintenance Task <br />Frequency of Task <br />9 <br />Powerwashing with simultaneousvacuuming also can be used to restore <br />As needed <br />surface infiltration to highly clogged areas of pervious concrete, porous <br />asphalt pervious pavers or permeable pavers, but is not recommended for <br />aeinforced grid paving_ <br />16 <br />inspect pervious pavementarea using the attached Inspection checklist. <br />quarterly or as needed <br />II, Prohibitions <br />Do not use pesticides or other chemical applications to control weeds or unwanted growth near <br />pavement or between pavers. <br />Mosquito Abatement <br />Should any mosquito issues arise, contact the San Mateo County Mosquito Abatement District {SMCMAD), as <br />needed for assistance. Mosquito larvicides shall be applied only when absolutely necessary, as indicated by <br />the SMCMAD, and then only by a licensed professional or contractor_ Contact information for SMCMAD is <br />provided below. <br />San Mateo County Mosquito Abatement District <br />1351 Rollins Road <br />Burlingame, CA 94010 <br />PH: {6501344-8592 <br />FAX: (6501344-3843 <br />Email inFo>ismcmad.pr� <br />IV. Inspections <br />The attached Pervious Pavement Inspection and Maintenance Checklist shall be used to conduct <br />inspections monthly (or as needed), identff,l needed maintenance, and record maintenance that is <br />conducted. <br />REV: 08-12-20 PR <br />Page 5 <br />ATTY/AGR.2020.136/Heron Court Cooperative Inc. (Page 15 of 16) <br />