My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Bear Electrical Solutions, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 Bear Electrical Solutions, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 4:31:32 PM
Creation date
1/20/2021 4:25:23 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bear Electrical Solutions, Inc.
PROJECT NAME
Electrical Construction Services
RMP File Number
304
Date
1/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c <br />r <br />STANDARD DETAIL FOR RRFB ASSEMBLY <br />I. <br />FURNISH AND INSTALL SOLAR PANEL AND <br />CONTROLLER CABINET WITH BATTERY <br />BACK-UP. SOLAR PANEL ANGLE TO SUN AS <br />^ <br />DIRECTED BY MANUFACTURER <br />METALLIC POLE CAP <br />FURNISH AND INSTALL W11-15 <br />PEDESTRIANIBIKE CROSSING SIGN ON EACH <br />SIDE OF POLE <br />FURNISH AND INSTALL <br />RECTANGULAR RAPID FLASHING <br />BEACON (RRFB); MODEL 920 FROM <br />GARMANAH OR APPROVED EQUAL <br />ON EACH SIDE OF POLE <br />FURNISH AND INSTALL STAINLESS STEEL <br />CLAMP AND BRACKET <br />FURNISH AND INSTALL 24"x12" <br />A?1 6-7PIS1 105 (L) AND S 1105 (R) <br />SUPPLEMENTAL ARROW PLAQUE <br />FURNISH AND INSTALL PEDESTRIAN <br />PUSH BUTTON WITH STANDARD SIGN <br />FURNISH AND INSTALL 4" NPS STANDARD <br />GALVANIZED TYPE 1-B POLE <br />FOUNDATION PER CALTRANS ;. <br />STANDARD PLAN ES -713. <br />4 <br />NOTE: POLE LOCATION SHALL BE MIN_ OF <br />fr '. 30" BEHIND THE FACE OF CURB. <br />RECTANGULAR RAPID FLASHING BEACON ASSEMBLY NOTES- <br />1- REFER TO 2418 CALTRANS STANDARD PLAN SHEET ES -TB DETAIL A-3 FOR ADDITIONAL <br />INFORMATION ON ASSEMBLY FOUNDATION. <br />RECTANGULAR RAPID FLASHING BEACON (RRFB) ASSEMBLY <br />HOT TO SCALE <br />REV: 12-21-2020 PR <br />ATTY/AGR.2020.306/Bear Electrical Solutions (Page 18 of 35) <br />
The URL can be used to link to this page
Your browser does not support the video tag.