My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt21 Bear Electrical Solutions, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2021
>
Under $100K
>
Agmt21 Bear Electrical Solutions, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 4:31:32 PM
Creation date
1/20/2021 4:25:23 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bear Electrical Solutions, Inc.
PROJECT NAME
Electrical Construction Services
RMP File Number
304
Date
1/15/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.16 RESTORATION OF EXISTING IMPROVEMENTS <br />A. Existing pavement or other improvements removed or damaged due to the installation of <br />work items shall be replaced in kind to the satisfaction of the City Engineer, at the <br />Contractor's expense. <br />B. Existing landscaping, irrigations, or plantings removed, damaged or disturbed due to the <br />work items shall be replaced in kind to the satisfaction of the City Engineer, at the <br />Contractor's expense. <br />C. All construction areas shall be left in a clean, neat and workmanlike condition. All <br />construction waste, rubbish and debris remaining upon completion of the work shall <br />become the property of the contractor unless otherwise specified herein or noted on the <br />plans and shall be removed from the worksite by contractor and disposed of off-site in a <br />lawful manner to the satisfaction of the City Engineer. <br />3.17 ACCEPTANCE TEST AND TURN ON <br />A. The work item will not be considered acceptable until it has been energized and visually <br />inspected by the City Engineer. Prior to acceptance testing, all equipment as shown on <br />the Plans shall be installed and operable, including but not limited to, pedestrian signals, <br />pedestrian push buttons, vehicle detectors, lighting, signs, and pavement delineation. <br />B. All louvers, visors, and signal faces shall be directed to provide maximum visibility. <br />C. Contractor shall pay all energy costs until the street light system has successfully passed <br />the acceptance test and initial turn on. <br />D. Initial turn on of signal systems shall be made between 9 a.m. and 2 p.m., unless specified <br />otherwise. <br />E. Contractor shall notify the City Engineer seven (7) days prior to intended date of initial turn <br />on. City will arrange for presence of the Police Department at the time of initial turn -on. <br />F. Turn -on procedures must be approved by the City Engineer. Contractor shall be <br />responsible for all required traffic control measures required for the turn -on, to the <br />satisfaction of the City Engineer. <br />END OF SECTION <br />ATTACHMENT 2 <br />NOTICE TO PROCEED <br />Dated: 20 <br />To: <br />(Contractor) <br />Address: <br />CONTRACT FOR: CITY OF REDWOOD CITY [PROJECT NAME] AT [PROJECT <br />ADDRESS] <br />REV: 12-21-2020 PR <br />ATTY/AGR.2020.306/Bear Electrical Solutions (Page 34 of 35) <br />
The URL can be used to link to this page
Your browser does not support the video tag.