Laserfiche WebLink
RAY'S ELECTRIC <br />411 PENDLETON WAY <br />SUITE B <br />SCHEDULE OF BID PRICES OAKLAND, CA 94621 <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. Bid <br />items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless words are <br />specifically requested. <br />JEFFERSON AVENUE INTERSECTIONS PROJECT Page 2 of 258 004113-2 <br />GF <br />EST. <br />ITEM <br />DESCRIPTION <br />QTY. <br />UNIT UNIT PRICE <br />TOTAL <br />1 <br />Mobilization/ Demobilization <br />Maximum 2.5% of total bid pricel <br />1 <br />LS <br />$18,000.00 <br />$ 18,000.00 <br />2 <br />Traffic Control <br />Maximum 5.0% of total bid rice) <br />1 <br />LS <br />$32,000.00 <br />$32,000.00 <br />3 <br />Construction Survey <br />Maximum 2.5/0 of total bid price <br />1 <br />LS <br />$17,000.00 <br />$17,000.00 <br />Water Pollution Prevention <br />4. <br />Program/ Best Management <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />Practices (BMPs) <br />1 <br />4-,W <br />5960 <br />LS <br />SF <br />$30,000.00 <br />$12.00 <br />$ 30.000.00 <br />$71,520.00 <br />5. <br />Clearing and Grubbing <br />6 <br />Roadway Excavation (including <br />base material) <br />7 <br />Remove and Dispose Concrete <br />Sidewalk including base material} <br />1,493 <br />SF <br />$10.00 <br />$14,930.00 <br />8 <br />Remove and Dispose Curb and <br />296 <br />LF <br />Gutter (including base material) <br />$20.00 <br />$ 5,920.00 <br />9 <br />Adjust Fire Hydrant to Grade <br />Adjust Water Valve Cover to Grade <br />1 <br />EA <br />EA <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 2,000.00 <br />10 <br />2 <br />$1,000.00 <br />11. <br />Adjust Gas Valve Cover to Grade <br />1 <br />EA <br />$ 1,500.00 <br />$1,500.00 <br />12. <br />Install Concrete Sidewalk <br />2,240 <br />SF <br />$20.00 <br />$44,800.00 <br />13. <br />Install Type A Concrete Curb and <br />336 <br />LF <br />Gutter <br />$63.00 <br />$ 21,168.00 <br />14. <br />Construct Concrete Curb Ramp <br />8 <br />EA <br />(Case A) <br />$3,500.00 <br />$28,000.00 <br />15. <br />Install Hot Mix Asphalt (HMA) <br />83 <br />TON <br />$ 230.00 <br />s19,090.00 <br />JEFFERSON AVENUE INTERSECTIONS PROJECT Page 2 of 258 004113-2 <br />GF <br />