Laserfiche WebLink
<br />RIVe NPDES 2008 <br /> <br />Page 3 <br /> <br />Proiect Cost: <br /> <br />Task 1: $21,600 (to be billed in monthly increments of$1,800) <br /> <br />Task 2: to be billed on a time and material basis as per the attached Schedule of Charges, with a <br />Not-to-Exceed cost of $3,000 <br /> <br />Task 3: to be billed on a time and material basis as per the attached Schedule of Charges, with a <br />Not-to-Exceed cost of$3,OOO <br /> <br />Not-fo-Exceed $27,600 <br /> <br />Ms. Ellen Ackerman is the Project Manager. Ms. Quinn Labadie is the Technician. <br /> <br />Assumptions and Limitations <br /> <br />The City will pay the annual NPDES permit fee. <br />Design, installation and maintenance (except where specifically stated) of the treatment system, <br />piping or pumps are not included in this proposal. <br />Any waste disposal and storage costs, including treated water, will be paid directly by the City. <br />This estimate does not include a cost for temporary holding tanks during system test periods. <br /> <br />****************************************************************************** <br /> <br />The signatures below iudicate that Green Environment inc. and the client have agreed <br />upon the scope, schedule, cost and limitations ofthis project. <br /> <br />Green Environment inc. <br /> <br />City of Redwood City <br /> <br />Date <br /> <br />Date <br /> <br />December 2007 <br />