My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 4:35:44 PM
Creation date
2/4/2021 4:26:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/8/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.C. - Page 6 of 43 <br />`� -)ss Mcuonaia co.,inc. <br />LIBRARY FURNITURE & SHELVING SOLUTIONS <br />1 154 STEALTH STREET <br />LIVERMORE, CA 94551 <br />925 455 1635 I FAX 925 373 1227 <br />Chapter 3 — Ross McDonald Company Qualifications <br />The most applicable experience to the Library Meeting Room Furniture project would be having worked <br />with the library to specify and then initially providing these exact products in the new "Teen area" which <br />in -turn established the basis of this RFP. Attached is a reference list that describes other past projects <br />and contact information of these clients. <br />Chapter 4 — Work Plan <br />our relationship with the Redwood City Library the course of many decades helps us understand their <br />objectives. By virtue of this relationship we helped the library to establish the furniture specification for <br />the meeting room, then we provided these exact furniture items which the library approved of and <br />ultimately became the basis of this RFP. <br />Work Plan of this Project: <br />1. Upon acceptance of our bid we would order the required materials. <br />2. 3 Branch will provide shop drawings for approval within 2 weeks. <br />3. At this time, the delivery of the tables and chairs would occur approximately 8 weeks after the <br />approval of the shop drawings. <br />4. The material will be delivered to our warehouse where it will be segregated per site. <br />5. We will work closely with the library staff to coordinate the delivery and installation of the <br />tables and chairs. <br />6. Our installers will deliver and assemble the material and remove trash and dunnage. <br />Chapter 5 — Ross McDonald Company Staff & Crew <br />Robert Schmidt will direct the staffing requirements for this project. Installation will be headed by <br />German Guerrero and his assistant Kevin Osterdock (resume's attached) as well as other installers as <br />required. <br />Chapter 6 —Cost Proposal <br />See attachment B Cost Proposal Schedule provided by Ross McDonald Company <br />Robert Schmidt, Vice President . 2_1 <br />Ross McDonald Company, Inc. <br />132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.