My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 4:35:44 PM
Creation date
2/4/2021 4:26:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/8/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 62 of 154 <br />(o) all Conditions of the Tentative Map; and <br />(p) all other work, improvements, or construction required by or specified in <br />the abovementioned plans and specifications, conditions of permits and <br />all construction, appurtenances and improvements necessary as <br />reasonably determined by the City Engineer to complete the <br />aforementioned improvements, both within and outside of the Property. <br />To facilitate issuance of separate bonds for different components of the Work, the <br />Improvements addressed by this Agreement are split into the following two separate <br />categories: the Blomquist Improvements and the Non-Blomquist Improvements. The <br />"Blomquist Improvements" mean and include the portion of the Improvements comprising <br />the Blomquist — Developer Segment and the Blomquist — County Segment including the <br />portion of the Offsite Water Line not included in the Non-Blomquist Improvements. The <br />balance of the Improvements, including the Blomquist — City Segment, are referred to <br />herein collectively as the "Non-Blomquist Improvements". The Non-Blomquist <br />Improvements include the Alternative Offsite Water Line. The construction, installation <br />and completion of the Blomquist Improvements and all labor and materials furnished in <br />connection therewith are hereinafter referred to collectively as the "Blomquist Work." The <br />construction, installation and completion of the Non-Blomquist Improvements and all labor <br />and materials furnished in connection therewith are hereinafter referred to collectively as <br />the "Non-Blomquist Work." "Work" means all of the Blomquist Work and the Non- <br />Blomquist Work; and "Improvements" means all of the Blomquist Improvements and Non- <br />Blomquist Improvements. <br />The Work and Improvements will be in strict compliance with the provisions of Chapter <br />30 of the Redwood City Code. In the event a conflict exists between the Improvement <br />Plans and the requirements of Chapter 30 of the Redwood City Code, the stricter <br />requirement or standard will govern, as determined by the City Engineer. <br />3.5 Blomquist Extension. <br />A. Subject to the credits and reimbursements described in the First <br />Amendment and consistent with Section 3.3 of the Development Agreement and subject <br />to the terms of this Section 3.5, Developer, at its expense, shall construct or cause the <br />construction of the Blomquist Improvements comprised of the Blomquist — Developer <br />Segment and the Blomquist — County Segment, including the Offsite Water Line. The <br />Parties acknowledge that the Blomquist — Developer Segment and Blomquist — County <br />Segment are linked in that construction of one segment, without the other, would not <br />serve the interests of the City or its residents or the inhabitants of the Project. The Parties <br />further acknowledge that Developer's ability to construct or cause the construction of the <br />portion of the Blomquist — County Segment located on the County -owned property is <br />contingent upon City obtaining an appropriate license or right of entry from the County of <br />San Mateo authorizing Developer and its contractors and subcontractors to enter upon <br />the County property for purposes of performing such work (the "County Authorization"). <br />City shall have until the date on which the final temporary certificate of occupancy has <br />been issued for the Project ("County Segment Outside Date") to obtain the County <br />REV: 01-21-2021 PR <br />ATTY/AGR.2021.01011548 Maple LLC (Page 4 of 29) 274 <br />
The URL can be used to link to this page
Your browser does not support the video tag.