Laserfiche WebLink
8.A. - Page 139 of 154 <br />Z-8 <br />I WHEN >Y1i17 O1HFA LAO MIL NON -PERMEABLE <br />SFE NOTE 5 NATIrE OR IMPORTED FILL- um_Nr caoS;INc LINER <br />�yP SCARIRm AND COMPACTED <br />STORM DRAIN PIPE 6' PERFORATED UNDERDRAIN (SLOPE AT <br />(SIZE PER PLAN) 0.5XMIN.) SFE U ILI Y PLAN FOR LOCATION <br />OF PIPE. <br />TYPICAL BIOAETENTION AREA <br />Km <br />1. TREATMENT SOIL MIX SHALL MEET REQUIREMENTS AS SPECIFIED IN THE SAN MATEO COUNTYWIDE WATER POLLUTION <br />PREVENTION PROGRAM (SMCWPPP) C.3 STORMWATER HANDBOOK DATED 2014 IN APPENDIX K. <br />2- THE BIOTREATMENT SOIL MIX USED IN ALL BIORETENTION AREAS SHALL COMPLY VATH THE SPECIFICATIONS IN <br />ATTACHMENT L OF THE RWOCB MUNICIPAL REGIONAL PERMIT. IF THE BIOIREATMENT SOIL MIX SUPPLIER IS INCLUDED ON <br />SMCWPPP'S 'BIOTREATMENT SOIL MIX SUPPLIER LIST- (SUPPLIER LIST), A BIOTREATMENT SOIL MIX SUPPLIER CERTIFICATION <br />STATEMENT (CFRTIFlCATIDN STATEMENT) SHALL BE COMPLETED BY THE SUPPLIER AND SUBMITTED TO THE CITY/PROJECT <br />ENGINEER A MINIMUM Of 14 DAYS PRIOR TO DELIVERY OF THE MATERIAL TO THE JOB SITE, If THE BIOTREATMENT SOIL <br />MIX SUPPLIER IS NOT INCLUDED ON THE SUPPLIER LIST. A BIOTREATMENT SOILS MIX VERIFICATION CHECKLIST <br />(VERIFICATION CHECKLIST) SHALL DE COMPLETED BY THE SUPPLIER AND SUBMITTED TO THE CITY/PROJECT ENGINEER A <br />MINIMUM OF 14 DAYS PRIOR TO DELIVERY OF THE MATERIAL TO THE JOB SITE- COPIES OF THC SUPPLIER LIST, <br />CERTIFICATION STATEMENT AND VERIFICATION CHECKLIST CAN BE DOWNLOADED FROM THE COUNTYWIDE PROGRAM'S <br />WEHSITE AT HTTP:[JFLOWSTOBAY.ORGM"di. ND <br />3. PERMEABLE DRAIN ROCK SHALL BE CLASS II, PER CALTRANS STANDARD SECTION 68-1.025. THE MATERIAL SHALL BE <br />WASHED AND FREE FROM CLAY OR ORGANIC MATERIAL <br />4. PERFORATED PIPE SHALL BE SOLVENT WELD PVC SDR 35 (OR APPROVED EQUAL) WITH PERFORATIONS FACED DOWN. <br />LOCATION OF THE PIPE VARIES. SEE PLAN. <br />5. FOR ANY LINER PENETRATIONS, RADIAL -CUT THE LINER FOR PIPE, MA5T1C AND SEAL WITH PIPE CLAMP TO INSURE <br />WATER -TIGHT SEAL <br />IT <br />B k F BIORETENT ONBBASIN DETAIL Ex -B7 <br />ENGINEERS. SURVEYORS . PLANNERS <br />1730 N. F1R3T STREET (441B -w7-moo Drawn: AA Checked: JM Approved: JM <br />SAN ,IDM CA 95112 ..w.t.�om Job No.: 20166066 Date: 12/01/2020 <br />REV: 01-20-21 PR <br />ATTYIAGR.2021.00911548 Maple LLC (1548 Maple - STMMA) (Page 20 of 34) 351 <br />IIUBBLFR1 . <br />'.4 �1411 FJIla. .., <br />1• <br />1• 1 1 <br />1• 1 1' y 1 <br />•i'1 1 <br />� <br />•0. <br />�tir�1 <br />1r <br />r <br />+■ <br />uLar <br />.. <br />INLET PIP •' / 1 <br />R` rar <br />SIZE <br />NO <br />I WHEN >Y1i17 O1HFA LAO MIL NON -PERMEABLE <br />SFE NOTE 5 NATIrE OR IMPORTED FILL- um_Nr caoS;INc LINER <br />�yP SCARIRm AND COMPACTED <br />STORM DRAIN PIPE 6' PERFORATED UNDERDRAIN (SLOPE AT <br />(SIZE PER PLAN) 0.5XMIN.) SFE U ILI Y PLAN FOR LOCATION <br />OF PIPE. <br />TYPICAL BIOAETENTION AREA <br />Km <br />1. TREATMENT SOIL MIX SHALL MEET REQUIREMENTS AS SPECIFIED IN THE SAN MATEO COUNTYWIDE WATER POLLUTION <br />PREVENTION PROGRAM (SMCWPPP) C.3 STORMWATER HANDBOOK DATED 2014 IN APPENDIX K. <br />2- THE BIOTREATMENT SOIL MIX USED IN ALL BIORETENTION AREAS SHALL COMPLY VATH THE SPECIFICATIONS IN <br />ATTACHMENT L OF THE RWOCB MUNICIPAL REGIONAL PERMIT. IF THE BIOIREATMENT SOIL MIX SUPPLIER IS INCLUDED ON <br />SMCWPPP'S 'BIOTREATMENT SOIL MIX SUPPLIER LIST- (SUPPLIER LIST), A BIOTREATMENT SOIL MIX SUPPLIER CERTIFICATION <br />STATEMENT (CFRTIFlCATIDN STATEMENT) SHALL BE COMPLETED BY THE SUPPLIER AND SUBMITTED TO THE CITY/PROJECT <br />ENGINEER A MINIMUM Of 14 DAYS PRIOR TO DELIVERY OF THE MATERIAL TO THE JOB SITE, If THE BIOTREATMENT SOIL <br />MIX SUPPLIER IS NOT INCLUDED ON THE SUPPLIER LIST. A BIOTREATMENT SOILS MIX VERIFICATION CHECKLIST <br />(VERIFICATION CHECKLIST) SHALL DE COMPLETED BY THE SUPPLIER AND SUBMITTED TO THE CITY/PROJECT ENGINEER A <br />MINIMUM OF 14 DAYS PRIOR TO DELIVERY OF THE MATERIAL TO THE JOB SITE- COPIES OF THC SUPPLIER LIST, <br />CERTIFICATION STATEMENT AND VERIFICATION CHECKLIST CAN BE DOWNLOADED FROM THE COUNTYWIDE PROGRAM'S <br />WEHSITE AT HTTP:[JFLOWSTOBAY.ORGM"di. ND <br />3. PERMEABLE DRAIN ROCK SHALL BE CLASS II, PER CALTRANS STANDARD SECTION 68-1.025. THE MATERIAL SHALL BE <br />WASHED AND FREE FROM CLAY OR ORGANIC MATERIAL <br />4. PERFORATED PIPE SHALL BE SOLVENT WELD PVC SDR 35 (OR APPROVED EQUAL) WITH PERFORATIONS FACED DOWN. <br />LOCATION OF THE PIPE VARIES. SEE PLAN. <br />5. FOR ANY LINER PENETRATIONS, RADIAL -CUT THE LINER FOR PIPE, MA5T1C AND SEAL WITH PIPE CLAMP TO INSURE <br />WATER -TIGHT SEAL <br />IT <br />B k F BIORETENT ONBBASIN DETAIL Ex -B7 <br />ENGINEERS. SURVEYORS . PLANNERS <br />1730 N. F1R3T STREET (441B -w7-moo Drawn: AA Checked: JM Approved: JM <br />SAN ,IDM CA 95112 ..w.t.�om Job No.: 20166066 Date: 12/01/2020 <br />REV: 01-20-21 PR <br />ATTYIAGR.2021.00911548 Maple LLC (1548 Maple - STMMA) (Page 20 of 34) 351 <br />