My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 4:35:44 PM
Creation date
2/4/2021 4:26:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/8/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.A. - Page 142 of 154 <br />REV: 01-20-21 PR <br />1548 Maple Street <br />Redwood City, CA 94063 <br />Stormwater Treatment Measure Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection mid Maintenance Checklists document theinspection and <br />maintenance conducted for the identified storinwater-treatment measure(s) subjectto the Maintenance <br />Agreement between the City and the property owner during the annual reporting period indicated below. <br />Property Information: <br />Property Address or APN: 1548 Map1q,.Street. RedwoodCity, 052-532-010 _ <br />Property Owner: <br />II. Contact Information: <br />Name of pez son to contact. regarding this report: MichaelOsborDe <br />Phone number ofcontact person: X9251-257-4350 RinaiL <br />Michael.Osborne <br />Address to which correspondence regarding this report should be directed: <br />3675 Mt Diablo BLvd, Suite 310 <br />Lafayette, CA94549 _. <br />III. Reporting Period: <br />This repots, with the attached completed izlspection checklists, documents the inspections and maintenance <br />of the identified treatment measures during the time periodfrom <br />IV. Stormwater Treatment Measure Information: <br />The following stormwater treatment measures (identified weatmeant measures) :u -e located <br />on the uroper ratified above atld are subi et to the MA€ntetaanee <br />Identifying "Type of Treatment 1uleasurti Location of Treatment Measure on the <br />Numbet of { Property <br />"Treatment I� E <br />Measure <br />1-20 Bio -retention Basin_. Sae l k ubiEB. --..._ <br />ATTYIAGR.2021.009I1548 Maple LLC (1548 Maple - STMMA) (Page 23 of 34) 354 <br />
The URL can be used to link to this page
Your browser does not support the video tag.