My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2021.02.08 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2021
>
AgdaPkt 2021.02.08 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 4:35:44 PM
Creation date
2/4/2021 4:26:17 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
2/8/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
612
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood Junction and the downtown tunnels <br />The Caltrain Business Plan anticipates operating up to 12 trains/hour/direction in the Peninsula at <br />maximum buildout (8 Caltrains and 4 HSR), so a potential service pattern could be: <br />- 4 trains stopping at Redwood Junction <br />- 4 trains stopping downtown <br />- 4 trains not stopping at either Redwood Junction or downtown <br />In this scenario, there would be only 4 trains/hour passing through downtown, so a full -buildout <br />scenario would result in a 33% reduction in pre-COVID Caltrain traffic through downtown RWC (4 <br />trains/hour vs. 6 pre-COVID). <br />I hope this makes sense. <br />Please feel free to reach out if you would like any additional information, including examples of how <br />these solutions were implemented in London and Amsterdam. <br />Sincerely, <br />Roland Lebrun <br />Cc <br />Caltrain Board <br />CHSRA Board of Directors <br />MTC Commissioners <br />Caltrain CAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.