Laserfiche WebLink
353 Main Street <br />Stormwater Treatment Measure Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection <br />and maintenance conducted for the identified stormwater treatment measure(s) subject to <br />the Maintenance Agreement between the City and the property owner during the annual <br />reporting period indicated below. <br />Property Information: <br />Property Address or APN: 353 Main Street Redwood City, CA 94063 <br />Property Owner: 353 Main Street Apartments, LP <br />II. Contact Information: <br />Name of person to contact regarding this report: Josh Zimmerman <br />Phone number of contact person:-Q4fl$) 727-66.65 Email: izimmerman@kierwrigiii.com <br />Address to which correspondence regarding this report should be directed: <br />3350 Scott Blvd Bldg 22 Santa Clara CA 95054 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections <br />and maintenance of the identified treatment measures during the time period from <br />IV. Stormwater Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) are located <br />on the propert identified above and are sub'ect to the Maintenance A reement: <br />Identifying <br />Number of <br />Treatment <br />Measure <br />Type of Treatment Measure <br />Location of Treatment Measure on the <br />Property <br />1 <br />Bio -Retention Pond <br />North East side of building, see exhibit <br />2 <br />Flow -Through Planter 1A <br />311 floor of podium deck, see exhibit <br />3 <br />Flow -Through Planter 1B <br />311 floor of podium deck, see exhibit <br />4 <br />Flow -Through Planter 1 C <br />3rd floor of podium deck, see exhibit <br />5 <br />Flow -Through Planter 1D <br />3'd floor of podium deck, see exhibit <br />6 <br />Flow -Through Planter lE <br />3" floor of podium deck, see exhibit <br />L7 <br />Flow -Through Planter 1F <br />3rd floor of podium deck, see exhibit <br />Page 1 O&M Inspection Report <br />ATTY/AGR.2019.317/Woodside Professional Center, LLC (Page 16 of 29) <br />