My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2020-058561
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2020-058561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 9:16:14 AM
Creation date
2/5/2021 11:37:07 AM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMMA 353 Main St Apts
Doc Num
2020-058561
Rec Date
6/23/2020
Parties
353 Mail St Apartments LP
MO Ref
20-082
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flow -Through Planter Maintenance Plan for <br />353 Main Street <br />Flow-through planters are designed to treat and <br />temporarily detain runoff without allowing <br />seepage into the underlying soil. They typically <br />receive runoff via downspouts leading from the <br />roofs of adjacent buildings. <br />Project Address and Cross Street: <br />353 Main Street, Bounded by Veterans Blvd <br />Assessor's Parcel No.: 052-38-3370 <br />Property Owner:. 353 Main Street Apartments, <br />LP <br />Phone No.: 408-984-5600 <br />Designated Contact: Drew Walstrum <br />Phone No.: 408-984-5600 <br />Mailing Address 1650 L.afa ette Street Santa Clara <br />CA 95050 <br />The property contains six (6) Flow -Through Planters, located as described below and as <br />shown in the attached site plan: <br />Flow-through Planter Area No. IA- <br />F is located: <br />Flow-through Planter Area No. 1 B- <br />F is located: <br />Flow-through Planter Area No. 1C - <br />F is located: <br />Flow-through Planter Area No. 1 D- <br />F is located: <br />Flow-through Planter Area No. 1 E- <br />F is located: <br />Flow-through Planter Area No. 1 F- <br />F is located: <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />3rd floor on the podium deck of the building <br />I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the <br />flow-through planter and landscaping remains attractive in appearance. Table 1 shows the <br />routine maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow -Through Planters <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Evaluate health of trees and groundcover. Remove and replace all dead <br />Twice a year <br />and diseased vegetation. Treat vegetation using preventative and low -toxic <br />methods. <br />2 <br />Maintain vegetation and the irrigation system. Prune and weed to keep flow- <br />As needed <br />through planter neat and orderly in appearance. <br />3 <br />Check that mulch is at appropriate depth (3 inches per soil specifications) <br />Monthly <br />and replenish as necessary. <br />KAO&KI Ayre.,en�214081\4ppG03n.-Ih,,I.,pin,c6.2- Page 1 <br />ATTY/AGR.2019.317/Woodside Professional Center, LLC (Page 19 of 29) <br />NDS Approved 12/5/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.