My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 R.C. Peninsula Park, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 R.C. Peninsula Park, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2010 4:38:16 PM
Creation date
4/16/2008 11:28:09 AM
Metadata
Fields
Template:
Agreement
Contractor Name
R.C. Peninsula Park, LLC
PROJECT NAME
Peninsula Park - Precise Plan
Date
2/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Attachment 3 <br /> <br />PHASING SCHEDULE FOR ZONE B, ZONE AB, AND ALL ZONES IMPROVEMENTS <br /> <br />This Attachment lists Project milestones by which time the East 101 Public Infrastructure Improvements <br />shall be completed. Refer to Attachment 1 for a map depicting the location of such improvements. The <br />East 101 Public Infrastructure Improvements shown on Attachment 1 but not on this Phasing Schedule <br />are not required for the Project, but rather are required for the redevelopment of other properties. <br /> <br />The milestones set forth in this Attachment are intended as a mandatory date by which City will require <br />such improvements to be completed. With consent of City and Developer, any of these improvements <br />may be completed sooner or may be combined with other East 101 Public Infrastructure Improvements <br />for the purposes of efficiency and cost savings. <br /> <br />Improvement Description Milestone event by which improvement is <br />Designation to be completed <br />R-WI0l Potable Water Line Under Prior to the issuance of the Certificate of <br /> Highway 101 and west of Occupancy for the hotel or the first Phase of <br /> Highway 101 residential development in the Project. <br />B-SS2 Sanitary Sewer Line Same as R-WI01. <br />B-SS3 Sanitary Sewer Line Same as R-WI01. <br />B-Wl Potable Water Line Same as R-WI01. <br />B-W2 Potable Water Line east of Same as R-WI01. <br /> Highway 101 <br />B-RWI Recycled Water Line Same as R-WIOl. <br />AB-SSPS Sanitary Sewer Pump Station Same as R-WI01. <br />R-Underpass Pedestrian Underpass Under Hwy Prior to the Final Map approval, that includes the <br /> 101 sooth residence in the Project. <br />R-Bridge Blomquist Bridge Same as R-Underpass. <br />R-New Road New Road from Bridge east to Same as R-Underpass. <br /> Maple <br />R-RWidenl East Bayshore Road Widening Same as R-Underpass. <br />R-RWiden2 Blomquist Same as R-Underpass. <br /> Reconstruction/W idening <br /> <br />ATTY/AGR/2008.013 EXHIBIT D <br />022708 <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.