Laserfiche WebLink
Redwood City RED MORTON REGIONAL STORMWATER CAPTURE PROJECT <br />craft (4water- <br />e n g in e e r in g, in c <br />Contract Type: Fixed Price by Deliverable <br />Task •i5 <br />Billing RatesF-27-0-oo-7 <br />PHASE 1. PRELIMINARY DESIGN REPORT <br />Task 1. Project Coordination, Monitoring, and Administration <br />Develop design plans & CEQA documents for the stormwater capture project at Red Morton Community Park in Redwood City, CA <br />CRAFTWATER ENGINEERING INC <br />S <br />..Labor <br />L U (A 0 CL Hours Effort <br />210.00250.00 205.00 205.00 J 170.00 135.00 <br />Submitted to: Redwood City (Attn: James O'Connell) <br />ODCs TOTAL• <br />•• <br />Meetings <br />40 <br />160 <br />80 <br />280 <br />67,200 <br />15,840 <br />12,056 <br />27,896 <br />95,096 <br />Monthly Progress Reports <br />24 <br />24 <br />4,920 <br />- <br />4,356 <br />4,356 <br />9,276 <br />Schedule <br />24 <br />24 <br />4,920 <br />- <br />- <br />4,920 <br />QA/QC Activities <br />48 <br />48 <br />10,080 <br />- <br />- <br />10,080 <br />Invoicing <br />24 <br />24 <br />48 <br />9,960 <br />- <br />4,356 <br />4,356 <br />14,316 <br />SUBTOTAL Task 1. Project Coordination, Monitoring, and Administration <br />40 <br />72 <br />160 <br />152 <br />- <br />- <br />- <br />424 <br />97,080 <br />- - - 15,840 <br />20,768 <br />- - - <br />36,608 <br />133,688 <br />Task 2. Preliminary Studies <br />Records Research <br />2 <br />2 <br />2 <br />16 <br />22 <br />3,480 <br />2,112 <br />- <br />2,112 <br />5,592 <br />Data Review <br />2 <br />2 <br />4 <br />16 <br />24 <br />3,890 <br />2,112 <br />2,112 <br />6,002 <br />Survey <br />2 <br />2 <br />4 <br />8 <br />16 <br />2,810 <br />19,129 <br />- <br />19,129 <br />21,939 <br />Geotechnical Evaluation <br />2 <br />2 <br />4 <br />8 <br />16 <br />2,810 <br />2,112 <br />40,150 <br />42,262 <br />45,072 <br />Hydrogeological Study (OPTIONAL - SEE BELOW) <br />- <br />- <br />- <br />Utility Research <br />2 <br />2 <br />4 <br />24 <br />32 <br />4,970 <br />- <br />- <br />4,970 <br />Hydrologic & Hydraulic Study <br />2 <br />2 <br />4 <br />16 <br />4 <br />40 <br />4 <br />72 <br />13,400 <br />13,400 <br />Hydraulic Modeling <br />1 <br />2 <br />8 <br />4 <br />10 <br />40 <br />65 <br />10,270 <br />10,270 <br />Water Quality Study <br />1 <br />2 <br />8 <br />2 <br />20 <br />4 <br />37 <br />6,700 <br />- <br />6,700 <br />Water Conservation Study <br />1 <br />2 <br />8 <br />2 <br />20 <br />4 <br />37 <br />6,700 <br />- <br />660 <br />660 <br />7,360 <br />Landscape & Site Restoration Study <br />2 <br />2 <br />4 <br />8 <br />16 <br />2,810 <br />1,210 <br />11,792 <br />13,002 <br />15,812 <br />Regulatory Requirements & Permitting <br />2 <br />2 <br />2 <br />16 <br />22 <br />3,480 <br />- <br />- <br />- <br />- <br />3,480 <br />SUBTOTAL Task 2. Preliminary Studies <br />2 <br />5 <br />24 <br />54 <br />36 <br />90 1 <br />148 <br />359 <br />61,320 <br />- - - 26,675 <br />12,452 <br />40,150 - - <br />79,277 <br />140,597 <br />Task 3. Preliminary Design Concepts Report <br />Alternative Evaluation <br />12 <br />12 <br />60 <br />60 <br />60 <br />120 <br />120 <br />444 <br />81,960 <br />1,870 <br />19,404 <br />- <br />21,274 <br />103,234 <br />Preliminary Layouts <br />12 <br />24 <br />72 <br />108 <br />17,640 <br />1,870 <br />17,985 <br />19,855 <br />37,495 <br />Preliminary Estimate of Probable Costs <br />6 <br />2 <br />8 1 <br />16 <br />2,990 <br />20,262 <br />5,500 <br />- 11,000 1 <br />36,762 <br />39,752 <br />Report <br />4 <br />4 <br />10 <br />20 <br />601 <br />40 <br />110 <br />248 <br />42,470 <br />4,224 <br />- <br />6,160 - <br />10,384 <br />52,854 <br />SUBTOTAL Task 3. Preliminary Design Concepts Report <br />•- <br />PHASE 2. DESIGN DEVELOPMENT <br />16 <br />16 <br />88 <br />80 <br />146 <br />160 <br />310 <br />816 <br />145,060 <br />- - - 28,226 <br />42,889 <br />- 6,160 1 11,000 <br />88,275 <br />233,335 <br />Task 4. Public & Stakeholder Outreach <br />Task <br />Outreach & Team Communications <br />4 <br />16 <br />20 <br />5,080 <br />- <br />4,961 <br />- - <br />4,961 <br />10,041 <br />Small Group Interviews & Collateral <br />8 <br />8 <br />16 <br />3,640 <br />5,280 <br />5,280 <br />8,920 <br />Public Workshops <br />2 <br />30 <br />12 <br />44 <br />10,500 <br />15,114 <br />15,114 <br />25,614 <br />Workshop Documentation <br />6 <br />6 <br />1,500 <br />4,026 <br />4,026 <br />5,526 <br />SUBTOTAL Task 4. Public & Stakeholder Outreach <br />6 <br />- <br />60 <br />20 <br />- <br />- <br />- <br />86 <br />20,720 <br />- - - - <br />29,381 <br />- - - <br />29,381 <br />50,101 <br />Task 5. CEQA Analysis <br />Phase I ESA <br />1 <br />1 <br />2 <br />455 <br />8,128 <br />- <br />8,128 <br />8,583 <br />Prepare Admin Draft IS & Confirm CEQA MND <br />4 <br />8 <br />12 <br />2,640 <br />- <br />67,173 <br />- - - <br />67,173 <br />69,813 <br />Finalize and Publish Public Draft IS/MND <br />4 <br />8 <br />12 <br />2,640 <br />- <br />5,984 <br />- - - <br />5,984 <br />8,624 <br />Respond to Comments & Prepare Final CEQA Docs <br />4 <br />8 <br />12 <br />2,640 <br />- <br />9,263 <br />- - - <br />9,263 <br />11,903 <br />Admin and Management <br />4 <br />8 <br />12 <br />2,640 <br />- <br />8,345 <br />8,345 <br />10,985 <br />SUBTOTAL Task 5. CEQA Analysis <br />- <br />- <br />17 <br />33 <br />- <br />- <br />- <br />50 <br />11,015 <br />- - - 8,128 <br />90,764 <br />- - - <br />98,892 <br />109,907 <br />Task 6. Project Design <br />30% PS&E <br />1 <br />4 <br />16 <br />20 <br />72 <br />360 <br />473 <br />72,570 <br />16,500 <br />27,038 <br />5,280 <br />48,818 <br />121,388 <br />60% PS&E <br />1 <br />4 <br />8 <br />20 <br />16 <br />49 <br />10,490 <br />119,141 <br />27,038 <br />3,520 <br />149,699 <br />160,189 <br />90% PS&E <br />1 <br />4 <br />8 <br />20 <br />16 <br />49 <br />10,490 <br />102,542 <br />27,962 <br />1,320 <br />131,824 <br />142,314 <br />Final PS&E <br />1 <br />4 <br />8 <br />10 <br />16 <br />39 <br />8,440 <br />51,821 <br />19,250 <br />- <br />71,071 <br />79,511 <br />ATTY/AGR.2020.309/Craftwater Inc (Page 32 of 34) <br />