Laserfiche WebLink
Principal (Oliver Galang, PE)QA/QC Manager (Brad Wardynski, PE)Project Manager (Courtney Semlow)Project Engineer (Andrew Takahashi, PE)Junior Engineer (Yulun Wu)Total Labor <br />Hours <br />Total Labor <br />Effort <br />Subcontracts (Electrical Engineer)Subcontracts (Landscape/ Environmental)Subcontracts (Structural Engineer)Total SubconsultantsTOTAL EFFORT271.00 210.00 240.00 184.00 146.00 <br />Task 5. CEQA Analysis <br />Finalize and Publish Public Draft IS/MND 1 2 2 5 1,119 - 12,034 - 12,034 13,153 <br />Respond to Comments and Prepare Final CEQA Docs 1 2 3 608 - 13,581 - 13,581 14,189 <br />Coordination and Communication for remainder of CEQA work 1 1 2 4 879 - 5,808 - 5,808 6,687 <br />SUBTOTAL Task 5. CEQA Analysis 2 - 4 6 - 12 2,606 - 31,423 - 31,423 34,029 <br />Task 6. Project Design <br />60% PS&E 2 2 24 120 240 388 63,842 35,492 32,742 18,480 86,713 150,555 <br />90% PS&E 2 2 16 80 140 240 39,962 27,995 33,941 13,860 75,796 115,758 <br />Final PS&E 2 2 8 40 80 132 21,922 20,400 28,666 13,860 62,926 84,848 <br />SUBTOTAL Task 6. Project Design 2 2 8 40 80 760 125,726 83,886 95,348 46,200 225,434 351,160 <br />Task 8. Permitting Support <br />Pre-filing Meeting with RWQCB (prepare and attend)1 2 3 751 - 2,299 - 2,299 3,050 <br />Prepare Technical Report and Permit Applications - - - 27,027 - 27,027 27,027 <br />USACE Nationwide Permit Application 1 2 3 751 7,359 751 <br />DFW Lake and Streambed Alteration Agreement (incl. BRE)2 2 480 11,319 480 <br />RWQCB Water Quality Certification 2 2 480 8,349 480 <br />Agency Follow up, Permit Review, and Coordination 1 2 3 751 - 8,613 - 8,613 9,364 <br />SUBTOTAL Task 8. Permitting Support 1 - 2 - - 13 3,213 - 37,939 - 37,939 41,152 <br />GRAND TOTAL 11 6 62 246 460 785 131,545 83,886 164,710 46,200 294,796 426,341 <br />Billing Rates <br />FEE PROPOSAL FOR: Red Morton Community Park Regional Stormwater Capture Project - Redwood City, CA <br />Contract Type: Fixed Price by Deliverable Phase 2B - Develop Final Design Plans, Final CEQA Documents, and Permitting Support Submitted to: City of Redwood City (Attn: James O'Connell, PE) <br />Task Description <br />CRAFTWATER ENGINEERING INC TOTAL COST <br />ATTY/AGR.2022/Amend. No. 2/Craftwater Inc (Red Morton Stormwater Capture) (Page 10 of 10)