My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 West Valley Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Under $60K
>
Agmt08 West Valley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2008 11:14:28 AM
Creation date
6/2/2008 11:13:25 AM
Metadata
Fields
Template:
Agreement
Contractor Name
West Valley Construction
PROJECT NAME
Sewer Air Release Valve Replacement
Date
5/30/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Community Development Services Department <br />Engineering and Construction <br /> <br /> <br />Redwood <br />O.IIV IlIfOPDlB <br />. r_1IIiI .1 <br /> <br />1017 Middlefield Road <br />P.O. Box 391 <br />Redwood City, CA 94064 <br />Telephone: 650.780.7380 <br />Facsimile: 650.780.7309 <br />www.redwoodcity.org <br /> <br />r--~~ =---; <br />. { <br /> <br />April 11, 2008 <br /> <br />TO: ALL INTERESTED CONTRACTORS <br /> <br />RE: SEWER AIR RELEASE VALVE REPLACEMENT PROJECT <br />(SHELL PARKWAY AND DAVIT LANE) <br /> <br />The City of Redwood City is soliciting bids for the above-named project. The work will <br />generally consist of the following: <br /> <br />~ Furnishing and conducting all necessary work, but not limited to, removing <br />existing sewage combination air release valve and concrete manhole which <br />includes trenching, bedding, dewatering, traffic control, notification, disposal of <br />debris, backfill, compaction of backfill, removal and replacement of pavement, <br />complete in place. <br /> <br />~ Furnishing and installing new sewage combination air release valve, new pre-cast <br />concrete manhole, new polyethylene pipe, gate valves, fittings, manhole frame <br />and cover, pipe supports, pre-cast concrete grade rings, connection to existing <br />force main, trenching, bedding, dewatering, traffic control, notification, disposal of <br />debris, backfill, compaction of backfill, pavement replacement and all associated <br />piping and components as shown on the plans. <br /> <br />All work shall be completed in accordance with the City of Redwood City standard <br />specifications and details unless otherwise indicated on the drawings. <br /> <br />We invite you to submit an informal bid on this project by 3 p.m. Wednesday, April 30th, <br />2008, to: <br /> <br />Mailing Address: <br /> <br />Delivery Address: <br /> <br />City of Redwood City <br />Engineering & Construction <br />Attention: Jimmy Tan, P.E. <br />P.O. Box 391 <br />Redwood City, CA 94064 <br /> <br />City of Redwood City <br />Engineering & Construction <br />Attention: Jimmy Tan, P.E. <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />Please contact me at 650-780-7397 if you have any questions. <br /> <br />Very truly yours, <br /> <br />~~ <br />Jimmy Tan, P.E. <br />Associate Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.