My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-06-09
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2008 3:27:51 PM
Creation date
6/5/2008 3:01:34 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
6/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5.48 <br />Page 7 <br /> <br />2. Inspection and Testing Costs. Certified inspections and operational tests <br />shall be at the expense of the customer-user. <br /> <br />3. Repair Cost. BackfIow prevention assemblies shall be repaired, <br />overhauled, or replaced at the expense of the customer-user whenever <br />said assemblies are found to be defective. <br /> <br />4. Record Keeping. Copies of records of such tests, repairs, and overhaul <br />shall be kept by the customer-user for a period of three (3) years and shall <br />be provided to the Director and maintained by the City for a period of no <br />less than three (3) years. <br /> <br />5. Access. The Customer-users system should be open for inspection and <br />testing at all reasonable times, or in case of emergency at any time, to <br />authorized representatives of the City to determine whether cross <br />connections or other structural or sanitary hazards, including violations of <br />these regulations, exist. <br /> <br />B. Director Responsibilities. The Director shall have the following responsibilities: <br /> <br />1. It shall be the duty of the Director to see that certified inspections and <br />operational tests are made in a timely manner. <br /> <br />2. At the Director's discretion, certified inspections and operational tests shall <br />be performed by Public Works Services personnel or a contractor hired by <br />the Director. <br /> <br />3. If the Director does not deem it appropriate for Public Works Services <br />personnel to test the assembly, the Director shall notify each affected <br />customer-user when it is time for the backflow prevention assembly <br />installed on the customer-user system to be tested. This written notice <br />shall give the customer-user thirty (3D) days to have the backflow <br />prevention assembly tested and the Director will make available the <br />necessary form to be completed and submitted to the Director. <br /> <br />4. The Director shall send a second notice to each customer-user who does <br />not have their backflow prevention assembly tested as prescribed in the <br />first notice within the thirty (30) day period allowed. The second notice <br />shall give the customer-user a two (2) week period to have their backflow <br />prevention assembly tested. <br /> <br />C. Billing for Testing. <br /> <br />The cost of any certified inspection or operational test performed by Public Works <br />Services Personnel or by a contractor hired by the Director shall be included as <br />part of the next ensuing municipal water bill presented to the customer-user. <br /> <br />A TTY/ORDIORD.305 <br />041608 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.