Laserfiche WebLink
<br />5.1F <br />Page 11 <br /> <br />. Potholing services for selected existing utilities are included and will be performed by <br />our subconsultant, Miller Pipeline, using vacuum excavation techniques. The <br />excavations will be patched with a cold patch, where they are made in pavement. <br /> <br />. The design and construction oftlle treatment, storage, pumping and distribution pipelines <br />will be provided under separate agreements with consultants and are not a part of this <br />scope of services. However, the scope of services herein provides for the coordination of <br />the preliminary service laterals locations for the distribution pipeline design team's use. <br /> <br />Contract Documents and Technical Specifications <br /> <br />. Consultant will develop and maintain general design criteria and standards for retrofits <br />that will be applied to all subsequent retrofit designs. <br /> <br />. Contract documents to be used for bidding and construction of customer retrofits under <br />this project will be prepared assuming: <br /> <br />. City's Bidding and Contract Documents will be used <br /> <br />. City's General and Supplemental Conditions will be used <br /> <br />. City's drafting standards and potable water system pipeline design details will be <br />used/modified as required to meet DHS requirements for recycled water systems. <br /> <br />. Kennedy/Jenks' Technical Specifications and Design Drawings will be used. <br /> <br />Bidding and Construction <br /> <br />It is assumed that the customer retrofit sites will be grouped for bidding and construction. Only <br />one bid package is assumed for this scope of services. Additional bid packages can be provided <br />as supplemental services, as described herein. <br /> <br />Other assumptions as stated on the enclosed tables and Scope of Services. <br /> <br />SCOPE OF SERVICES: <br /> <br />Kennedy/Jenks Consultants (Consultant) shall provide professional engineering services for the <br />complete conversion of potable water customers to recycled water service under the following <br />major task headings. <br /> <br />Scope of Services Outline <br /> <br />Task 1 - Project Management and Administration <br /> <br />1.1 Wark Plan and Monthly Invoices/Status Reports <br /> <br />Agreement over $lOK 5 <br />Rev-3 052308 <br />