My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2008-06-23 Clsd and Special
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2008
>
AgdaPkt 2008-06-23 Clsd and Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2008 4:43:10 PM
Creation date
6/19/2008 4:28:47 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Redevelopment Agency
Date
6/23/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REPORT <br /> <br />6.1G <br />Pa e 1 of 2 <br /> <br /> <br />June 23, 2008 <br /> <br />SUBJECT <br />Award of Contract - 2007-2008 Sewer Main Replacement Project <br /> <br />RECOMMENDATION <br />Approve, by motion, the Contract Documents and award the contract for the 2007-2008 <br />Sewer Main Replacement Project to the lowest responsible bidder, Sanco Pipelines, <br />Inc. of Campbell for their low bid of $765,746.32 and authorize the City Manager to <br />increase the contract amount, if necessary, up to 10% of the amount awarded. <br /> <br />BACKGROUND <br />The City systematically replaces sections of aging sewer infrastructure to ensure the <br />continued reliability of the system. Every year, Engineering & Construction and Public <br />Works Services staff identify pipelines that have required excessive maintenance or <br />have experienced repeated service disruptions and target those pipelines for <br />repair/replacement. <br /> <br />Recently, the City has become more proactive in assessing the condition of the system <br />by employing closed circuit television inspection services (CCTV). This technology <br />helps to identify pipe defects such as cracks, offset joints, and root intrusion that can be <br />remediated before a service failure. As well, these kinds of repairs ensure a fully <br />functioning system as defects in the sewer collection system allow ground water to <br />infiltrate the pipelines thereby reducing their capacity to collect sewerage during wet <br />weather conditions. With CCTV, the condition of an entire sewer basin can be <br />inspected and assessed prior to the start of the annual replacement program to more <br />thoroughly identify sections in need of repair/replacement. <br /> <br />The 2007-2008 Sewer Main Replacement Project includes rehabilitation of pipe <br />segments in the sewer basin bordered by Edgewood Road, Whipple Avenue, Alameda <br />de las Pulgas, and EI Camino Real. This project will rehabilitate approximately 3,646 <br />linear feet of sewer main and replace approximately 1,597 linear feet of 6-inch and 8- <br />inch pipeline. Both cured-in-place-pipe ("CIPP") trench less technology and traditional <br />excavation methods will be used. Some pipe defects, particularly those resulting in <br />pronounced misalignment, cannot be mitigated with trenchless technology. <br /> <br />Six (6) bids were received at the bid opening on May 21, 2008 and are summarized <br />below. <br /> <br /> <br />Bidder <br /> <br />Bid Amount <br />$765,746.32 <br />$785,339.50 <br />$818,000.00 <br />$934,923.00 <br />$956,375.00 <br />$973,790.00 <br /> <br />Recommended Bidder: Sanco Pipelines, Inc. <br />Substantiation: Sanco Pipelines, Inc. is the lowest responsive and responsible bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.