<br />Page 2 of2 <br /> <br />October 26, 2009 <br /> <br />Pump Station Configuration <br />Total Additional Fee: $17,500 <br /> <br />RMC's original scope for the Glenwood Pump Station was based on an assumption of maintaining all <br />existing equipment and adding a simple structure to house this equipment. As design has progressed, <br />some of the basic assumptions relative to scope of the design have been expanded to improve pumping <br />efficiency, operational flexibility, neighborhood impacts, and site security. These additional features <br />require a scope and fee modification to accommodate the new improvements. Specifically, the <br />following changes and additions are required: <br /> <br />1. Hydraulic modeling determined that variable frequency drives (VFDs) would improve pump <br />efficiency and operational flexibility. Inclusion of VFDs requires modification to the existing <br />pump motors, additional space to house this equipment within the pump station enclosure, and <br />rework associated with the electrical design presented in the Preliminary Design Technical <br />Memorandum; <br />2. The pump station building is currently envisioned to be cOlllprised of two rooms, and will <br />encompass an area occupied by the existing flow meter vault. This configuration is more <br />complex than that envisioned during the development of the initial design scope, and requires <br />special slab design to accommodate existing structures and isolation of the new generator pad; <br />3. The final building location will require relocation of utilities not impacted by initial <br />configurations; <br />4. RMC has developed multiple iterations of layout and section figures of the pump station for the <br />City's use in negotiation with SFPUC (not part of the final design plans); <br />5. The project duration has extended beyond the schedule originally assumed by RMC. The time <br />extension has resulted in additional project management expenditures. <br /> <br />Project Schedule <br /> <br />RMC will complete the design of the Glenwood Pump Station is accordance with a schedule that is <br />mutually agreeable to both the City and RMC. RMC's proposed schedule for completing the design is <br />as follows: <br /> <br />. Submit 65% Deliverable: <br />. Submit 100% Deliverable: <br />. Submit Bid Documents: <br /> <br />December 18,2009 <br />60 days after receipt of comments from City on 65% submittal <br />30 days after receipt of comments from City on 100% submittal <br /> <br />These additional work items will improve the overall efficiency and reliability of the Glenwood Pump <br />Station, and provide long term value to the City. Thank you for your consideration of our budget <br />amendment request. We look forward to working with you as we complete the final design of this <br />facility. <br /> <br />Sincerely, <br /> <br />b~~ <br /> <br />Dennis Gellerman <br />Project Manager <br />