Laserfiche WebLink
<br />exhibit: On the Slough <br /> <br />6.1D <br />Page 16 <br /> <br />30 Flight Railing - 12' long railing allows adults and children to learn about a F.1 <br />bird's winQ motion. <br /> SRS materials $7,060 <br /> SRS staff time: 74 hours $4,810 <br /> total Flight Rail $11,870 6/18-7/7/2008 <br />31 Graphic Rail (72" x 15") - The South Bay is reststop on Pacific Flyway. F.2 <br /> SRS materials $1,177 <br /> SRS staff time: 17 hours $1,105 <br /> total Rail birds 1 $2,282 6/18-7/712008 <br />32 Graphic Rail (72" x 15") - Infrequent Bird Visitors F.3 <br /> SRS materials $1,177 <br /> SRS staff time: 17 hours $1,105 <br /> total Rail birds 2 $2,282 6/18-7/712008 <br />33 Life-Size Bird Cutouts - Five phenolic resin life-sized bird cut-outs. F.5 <br /> SRS materials $2,25€ <br /> SRS staff time: 20 hours $1,30C <br /> total Bird Cut-outs $3,556 6/18-7/7/2008 <br />34 Dichotomous Finger Key - What Bird is That? This graphic panel has FA <br /> SRS materials $3,15S <br /> SRS staff time: 16 hours $1,040 <br /> total Bird I D $4,198 6/18-7/7/2008 <br /> <br />subtotal <br /> <br />Design, Project Management <br /> <br />$24,188 <br /> <br />35 Graphic Design and Production <br /> SRS materials $1,230 <br /> SRS staff time: 130 hours $8,450 <br /> total Graphic Design $9,680 6/18-8/01/2008 <br />36 Graphics and Curatorial <br /> SRS materials $165 <br /> SRS staff time: 91 hours $5,915 <br /> total Graphics and Curatorial $6,080 6/18-8/27/2008 <br />37 Project Management <br /> SRS materials $549 <br /> SRS staff time: 171 hours $11.115 <br /> total Project Managemen $11,664 6/18-8/27/2008 <br />38 Shipping and Installation <br /> SRS materials $17.101 <br /> SRS staff time: 150 hours $9,750 <br /> total Shipping and Installation $26,851 8/13-8/27/2008 <br /> <br />subtotal <br /> <br />Split Rock Studios total <br /> <br />$54,275 <br /> <br />$277,000 <br />