Laserfiche WebLink
<br />6.1E <br />Page 8 <br /> <br />City, who shall be a qualified licensed Civil Engineer in the State of California, to represent the <br />City during the construction. City shall have the right to inspect the construction during the course <br />thereof in company with SBSA's inspector or other representative designated by SBSA's <br />Manager, City shall provide SBSA reasonable notification of City's intention to inspect by <br />personal, written, telephonic, or other electronic communication, SBSA's construction manager <br />and City's representative shall cooperate and consult with each other; however, any decision that <br />deviates from the Contract Documents shall be subject to the approval of City's representative <br />and SBSA's construction manager. <br />19. SBSA shall submit to City a final report that describes the work performed. <br />20. City hereby grants to SBSA permission and license to enter and occupy that portion of <br />the Perimeter Levee that comprises the site of the Segment III Project for the purpose of <br />constructing said Project and all necessary or appropriate activities pertaining thereto. The <br />permission and license shall commence upon the date hereof and shall remain in full force and <br />effect for the duration of the construction of the Segment III Project, acceptance thereof by SBSA, <br />and for the period of time during which all guarantees or other obligations of SBSA's general <br />contractor for the Project remain in effect from and after acceptance by SBSA of said Project. City <br />hereby warrants and covenants that City possesses an easement or other property rights in the <br />Perimeter Levee, including the site of the Segment III Project, at least commensurate with the <br />permission and license hereby granted to SBSA. <br />...21. SBSA shalln otaccept the improvements constructed as part of the Segment III <br />Project that are located within City's easement without City's City Engineer's final inspection and <br />approval and the submission of record drawings to City. A copy of the record drawings on mylar <br />shall be provided to the City's City Engineer. <br />22, If City disapproves the Segment III Project after final inspection, City shall specify in <br />writing the reason(s) for disapproval, which shall be limited to defects resulting from failure of the <br />construction to conform to the requirements of the Contract Documents. <br />23. Upon SBsAs concurrence with the specified reason(s), SBSA shall direct its general <br />contractor to remedy the defects. Upon completion of any corrective action by said contractor, or <br />if no defects exist, City shall notify SBSA in writing of City's approval for acceptance of the <br />Segment III Project. Thereupon, SBSA shall accept the Project and cause a Notice of Completion <br />thereof to be recorded. <br />24, Not less than thirty~five (35) days following recordation of the Notice of Completion, <br />SBSA shall assign to City all right, title and interest in the Segment III Project, including all <br /> <br />5 <br /> <br />ATTY/AGR/2008,26 RC_SBSALeveeSegIIlK050708 (5) <br />072208 <br />