<br />, ,
<br />
<br />Attachment 2
<br />City of Redwood City
<br />
<br />East 101 Public Infrastructure Requirements
<br />
<br />
<br />Pro'ect Code
<br />R-BRIDGE Transportation (Bridge)
<br />R-UNDERPASS (ped underpass)
<br />R-NEWROAD (road from bridge to maple east)
<br />R-WBRIDGE Water (Under the bridge :) )
<br />R-WBLOMQUIST Water Pipe from Seaport to Bridge
<br />R-WTANK Water (Tank & PS & Land)
<br />R-W101 Waterline
<br />R-RWIDEND1 E. Bayshore Rd pavement
<br />R-RWIDEND2 Blom uist Rd. avement
<br />
<br />A-W1
<br />S-SS1
<br />AB-SSPS
<br />A-SDPS
<br />
<br />B-W1
<br />B-W2
<br />B-RW1
<br />B-SS1, 2 & 3
<br />AB-SSPS
<br />
<br />C-SS 1
<br />
<br />
<br />Totals
<br />
<br />EDU
<br />
<br />2635
<br />
<br />EDU
<br />
<br />EDU
<br />
<br />1401
<br />
<br />1001
<br />400
<br />
<br />EDU
<br />
<br />EDU
<br />
<br />Cost
<br />$4,800,000.00
<br />$2,000,000.00
<br />$1,000,000.00
<br />$280,000.00
<br />$1,859,200.00
<br />$10,447,320.00
<br />$336,000.00
<br />$1,142,400.00 $
<br />$1,091,626.67
<br />$22,956,546.67
<br />
<br />Cit Contribution Cost/EDU
<br />$5,000,000.00
<br />
<br />455,000.00
<br />
<br />
<br />Bayside Gardens
<br />Water (zone dist system)
<br />Sewer (collection sys)
<br />Sewer (pump station) - Shared with B
<br />Storm um station
<br />Zone Pro'ect Subtotal
<br />All Zone Project Subtotal
<br />Zone Project + All Zone Project Total
<br />Bayside Gardens Contribution
<br />
<br />
<br />
<br />Pete's Harbor, Penn Park
<br />Water (zone dist system)
<br />Water (zone dist system)
<br />Recycled water
<br />Sewer (collection sys)
<br />Sewer um station - Shared with A
<br />Zone Pro'ect Subtotal
<br />All Zone Project Subtotal
<br />Zone Project + All Zone Project Total
<br />Penn Park Contribution
<br />Pete's Harbor Contribution
<br />
<br />
<br />
<br />
<br />Abbott Labs, Insdusttrial, Pacific Shores
<br />Water (area dist system) - TBD
<br />Sewer (collection sys) - TBD
<br />Road + Storm - TBD
<br />Zone Pro'ect Subtotal
<br />All Zone Project Subtotal
<br />Zone Project + All Zone Project Total
<br />Abbott Labs Site Contribution
<br />Industrial Area Contribution
<br />Pacific Shores Area Contribution
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />604
<br />
<br />$571,200.00
<br />$357,000.00
<br />$295,273.17
<br />$980,000.00
<br />$2,203,473.17
<br />$5,263,153.02
<br />$7,466,626.19
<br />$7,466,626.19
<br />
<br />:$,).711.67
<br />
<br />604
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />$1,030,400.00
<br />$336,000.00
<br />$394,800.00
<br />$680,400.00
<br />$684,726.83
<br />$3,126,326.83
<br />$12,205,044.07
<br />$15,331,370.90
<br />$10,954,105.83
<br />$4,37"1,265.07
<br />
<br />
<br />Cost
<br />
<br />CostlEDU
<br />
<br />210
<br />
<br />$378,000.00
<br />$378,000.00
<br />$1,829,449.86
<br />$2,207,449.86
<br />
<br />
<br />210
<br />
<br />
<br />Cost
<br />
<br />Cost/EDU
<br />
<br />420
<br />
<br />$0.00
<br />$3,658,899. 72i;$mf[$il11i~67
<br />$3,658,899.72
<br />$2,352,149.82
<br />$0.00 Impact assessment will be case by c
<br />$1,306,749.90 basis via CEQA and Use Permit.
<br />
<br />270
<br />o
<br />150
<br />
<br />This Table shows foreseeable projects for individual Zone and the Region. Additional projects may be added.
<br />Each development is responsible for construction of their own site utilities improvement projects in addition to their monetary
<br />contribution and lor building of specific zone and region projects.
<br />Project costs and EDU estimates are subject to annual review and revision
<br />EDU = 2000 SF Commercial Floor Area or one housing uit.
<br />
<br />rev 12/11/2007
<br />
|