Laserfiche WebLink
<br />, , <br /> <br />Attachment 2 <br />City of Redwood City <br /> <br />East 101 Public Infrastructure Requirements <br /> <br /> <br />Pro'ect Code <br />R-BRIDGE Transportation (Bridge) <br />R-UNDERPASS (ped underpass) <br />R-NEWROAD (road from bridge to maple east) <br />R-WBRIDGE Water (Under the bridge :) ) <br />R-WBLOMQUIST Water Pipe from Seaport to Bridge <br />R-WTANK Water (Tank & PS & Land) <br />R-W101 Waterline <br />R-RWIDEND1 E. Bayshore Rd pavement <br />R-RWIDEND2 Blom uist Rd. avement <br /> <br />A-W1 <br />S-SS1 <br />AB-SSPS <br />A-SDPS <br /> <br />B-W1 <br />B-W2 <br />B-RW1 <br />B-SS1, 2 & 3 <br />AB-SSPS <br /> <br />C-SS 1 <br /> <br /> <br />Totals <br /> <br />EDU <br /> <br />2635 <br /> <br />EDU <br /> <br />EDU <br /> <br />1401 <br /> <br />1001 <br />400 <br /> <br />EDU <br /> <br />EDU <br /> <br />Cost <br />$4,800,000.00 <br />$2,000,000.00 <br />$1,000,000.00 <br />$280,000.00 <br />$1,859,200.00 <br />$10,447,320.00 <br />$336,000.00 <br />$1,142,400.00 $ <br />$1,091,626.67 <br />$22,956,546.67 <br /> <br />Cit Contribution Cost/EDU <br />$5,000,000.00 <br /> <br />455,000.00 <br /> <br /> <br />Bayside Gardens <br />Water (zone dist system) <br />Sewer (collection sys) <br />Sewer (pump station) - Shared with B <br />Storm um station <br />Zone Pro'ect Subtotal <br />All Zone Project Subtotal <br />Zone Project + All Zone Project Total <br />Bayside Gardens Contribution <br /> <br /> <br /> <br />Pete's Harbor, Penn Park <br />Water (zone dist system) <br />Water (zone dist system) <br />Recycled water <br />Sewer (collection sys) <br />Sewer um station - Shared with A <br />Zone Pro'ect Subtotal <br />All Zone Project Subtotal <br />Zone Project + All Zone Project Total <br />Penn Park Contribution <br />Pete's Harbor Contribution <br /> <br /> <br /> <br /> <br />Abbott Labs, Insdusttrial, Pacific Shores <br />Water (area dist system) - TBD <br />Sewer (collection sys) - TBD <br />Road + Storm - TBD <br />Zone Pro'ect Subtotal <br />All Zone Project Subtotal <br />Zone Project + All Zone Project Total <br />Abbott Labs Site Contribution <br />Industrial Area Contribution <br />Pacific Shores Area Contribution <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />604 <br /> <br />$571,200.00 <br />$357,000.00 <br />$295,273.17 <br />$980,000.00 <br />$2,203,473.17 <br />$5,263,153.02 <br />$7,466,626.19 <br />$7,466,626.19 <br /> <br />:$,).711.67 <br /> <br />604 <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />$1,030,400.00 <br />$336,000.00 <br />$394,800.00 <br />$680,400.00 <br />$684,726.83 <br />$3,126,326.83 <br />$12,205,044.07 <br />$15,331,370.90 <br />$10,954,105.83 <br />$4,37"1,265.07 <br /> <br /> <br />Cost <br /> <br />CostlEDU <br /> <br />210 <br /> <br />$378,000.00 <br />$378,000.00 <br />$1,829,449.86 <br />$2,207,449.86 <br /> <br /> <br />210 <br /> <br /> <br />Cost <br /> <br />Cost/EDU <br /> <br />420 <br /> <br />$0.00 <br />$3,658,899. 72i;$mf[$il11i~67 <br />$3,658,899.72 <br />$2,352,149.82 <br />$0.00 Impact assessment will be case by c <br />$1,306,749.90 basis via CEQA and Use Permit. <br /> <br />270 <br />o <br />150 <br /> <br />This Table shows foreseeable projects for individual Zone and the Region. Additional projects may be added. <br />Each development is responsible for construction of their own site utilities improvement projects in addition to their monetary <br />contribution and lor building of specific zone and region projects. <br />Project costs and EDU estimates are subject to annual review and revision <br />EDU = 2000 SF Commercial Floor Area or one housing uit. <br /> <br />rev 12/11/2007 <br />