My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Split Rock Studios
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Split Rock Studios
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2008 11:56:21 AM
Creation date
8/11/2008 11:56:20 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Split Rock Studios
PROJECT NAME
Museum Exhibit Design and Fabrication Services
RMP File Number
304
Date
6/17/2008
MO Ref
08-146
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />exhibit: On the Slough <br /> <br />30 Flight Railing - 12' long railing allows adults and children to learn about a F.1 <br />bird's wing motion. <br /> SRS material $7,06C <br /> SRS staff time: 74 hour $4,81C <br /> total Flight Ra $11,870 6/1 8-7/7/2008 <br />31 Graphic Rail (72" x 15") - The South Bay is reststop on Pacific Flyway. F.2 <br /> SRS material $1,17 <br /> SRS staff time: 17 hour $1, 10~ <br /> total Rail birds $2,282 6/18-7/7/2008 <br />32 Graphic Rail (72" x 15") - Infrequent Bird Visitors F.3 <br /> SRS material $1,17 <br /> SRS staff time: 17 hour $1,1 O~ <br /> total Rail birds $2,282 6/18-7/7/2008 <br />33 Life-Size Bird Cutouts - Five phenolic resin life-sized bird cut-outs. F.5 <br /> SRS material $2,25E <br /> SRS staff time: 20 hour $l,3OC <br /> total Bird Cut-out $3,556 6/18-7/7/2008 <br />34 Dichotomous Finger Key - What Bird is That? This graphic panel has F.4 <br /> SRS material $3,158 <br /> SRS staff time: 16 hour $1,040 <br /> total Bird I[ $4,198 6/18-7/7/2008 <br /> <br />subtotal <br /> <br />$24,188 <br /> <br />Design, Project Management <br /> <br />35 Graphic Design and Production <br /> SRS material $1,230 <br /> SRS staff time: 130 hour $8,450 <br /> total Graphic Desig $9,680 6/18-8/01/2008 <br />36 Graphics and Curatorial <br /> SRS material $165 <br /> SRS staff time: 91 hour $5,915 <br /> total Graphics and Curatori I $6,080 6/18-8/27/2008 <br />37 Project Management <br /> SRS material $549 <br /> SRS staff time: 171 hour $11,115 <br /> total Project Manageme t $11,664 6/18-8/27/2008 <br />38 Shipping and Installation <br /> SRS material $17,101 <br /> SRS staff time: 150 hour $9,750 <br /> total Shipping and Installatio $26,851 8/13-8/27/2008 <br /> <br />subtotal <br /> <br />$54,275 <br /> <br />Split Rock Studios total <br /> <br />$277,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.